Home » Posts tagged 'keith coughlan'

Tag Archives: keith coughlan

Cadence Minerals #KDNC – European Metals Holdings #EMH – Successful production of lithium hydroxide at Cinovec

Cadence Minerals (AIM: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (“European Metals” or “EMH”) (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) in regard to the Cinovec Lithium Project (“Cinovec” or the “Project”).

EMH has announced the successful production of lithium hydroxide monohydrate from pregnant leach solution manufactured during the recent larger scale Cinovec pilot programme.

Highlights:

  • The pilot programme has confirmed viability of the Lithium Chemical Plant (“LCP”) process flowsheet for the industrial scale production of either lithium carbonate or lithium hydroxide.
  • Crude lithium carbonate from the pilot programme has been converted into exceptionally clean battery-grade lithium hydroxide monohydrate at laboratory scale.
  • The pilot programme processed ore is fully-representative in all respects of the run-of-mine for the first seven years of mining planned at Cinovec, including average grade and expected rock-type mix from the bulk mining.

The Cinovec LCP flowsheet produces a high purity lithium sulphate solution which is capable of being used to produce either lithium carbonate or lithium hydroxide. The first stage (un-reprocessed) crude lithium carbonate produced is very close to battery grade and easily upgraded to battery grade in a single bicarbonation step (see the Company’s ASX/ AIM announcement of 9 November 2023 “Successful Battery-Grade pilot programme for Cinovec Lithium Project”).

The Cinovec LCP flowsheet lends itself to producing battery-grade lithium hydroxide monohydrate either directly, or indirectly via re-processing the first stage crude lithium carbonate. The project team has assessed the relative industrial process risks of manufacturing battery-grade lithium hydroxide monohydrate using both methods. It was concluded the indirect method was regarded as the lower-risk method, when considering process risks and costs.

This method of production of lithium hydroxide monohydrate has been tested as part of the pilot programme and has successfully produced battery-grade lithium hydroxide monohydrate at a laboratory scale.

Link here to view the full EMH announcement

EMH Executive Chairman, Keith Coughlan commented: We are extremely pleased with the results from the lithium hydroxide test program.  The lithium hydroxide produced was of the highest grade possible and exceptionally clean. This, when combined with the ability to produce either battery grade lithium carbonate or hydroxide enables a wider range of offtakers for the Cinovec product.”

Cadence CEO Kiran Morzaria added: “The Cadence management team are delighted to see EMH achieve another milestone step at Cinovec. In producing this high grade lithium hydroxide, the EMH team have opened up new offtake opportunities for the end product.”

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 3.2% per cent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 20 7220 1666
James Joyce
Darshan Patel
Fortified Securities – Joint Broker +44 (0) 20 3411 7773
Guy Wheatley
Brand Communications +44 (0) 7976 431608
Public & Investor Relations      
Alan Green

Cadence Minerals #KDNC – European Metals Holdings #EMH – Cinovec Project Update

Cadence Minerals (AIM: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (“European Metals” or “EMH”) (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) in regard to the Cinovec Lithium Project (“Cinovec” or the “Project”).

Geomet (“Geomet”), 49% owned by European Metals and the owner of 100% of the Cinovec Project in the Czech Republic, is in the process of completing the Project Definitive Feasibility Study (“DFS”). DRA Global Limited (“DRA”) was appointed to complete the DFS in February 2023.

EMH has previously advised in the announcement to the market on 22 December 2023 that the delivery of the DFS for the Project had been pushed back and was expected to be completed in Q1 2024.

As a result of the engineering work and social and environmental engagement work subsequently performed as part of the DFS process, several material matters have been highlighted that may significantly improve the lithium processing component of the DFS.

The Geomet management team, in conjunction with DRA, is reviewing these matters. The Company expects to make a further announcement before the end of April 2024 detailing some of the more significant issues. Further, the Company reiterates that the process flowsheet remains as announced on 31 October 2022 and confirmed in pilot testing results announced on 9 November 2023. This review process could significantly improve the economic and social/community outcomes. Geomet considers this to be an important development in the Project and makes a further delay in the DFS well justified.

Importantly, as previously reported, the Company does not expect that the extension of the study period will impact the overall Project timeline, with the permitting process expected to be effectively coordinated pursuant to the enactment of the European Union’s Critical Raw Materials Act.

In other matters concerning the DFS Process, EMH is pleased to announce that previously published physical and hydrometallurgical process flowsheets have been confirmed to be viable for engineering and construction purposes with high levels of lithium recovery from run-of-mine ore to battery-grade end-products.

As previously noted, engineering test work programmes continue to improve process outcomes in various stages of both the physical and hydrometallurgical processing, and current test work programmes include:

  • Gangue removal from zinnwaldite concentrate to enable a higher-grade roast mix to be processed by the rotary kilns, thus maximising the throughput of lithium units in the roasting without an increase in the size of the plant;
  • recycling and regeneration of reagents in both the roasting and hydrometallurgical stages to reduce the consumption of fresh reagents and decrease opex per tonne of end-product, and
  • simplification of precipitation/crystallisation processes to reduce energy and water costs, aiming at producing end-products with the lowest economic carbon footprint.

Executive Chairman, Keith Coughlan, commented on the update: “Whilst it is unfortunate not to be able to provide a fully completed DFS at this stage, I am confident that the developments currently being finalised will add significantly to the Project. In particular, permitting and timelines are expected to be positively impacted by the team’s additional work. The Cinovec Project remains an important part of the drive to improve critical materials security in the EU.”

Link here to view the full EMH announcement

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 4.9% percent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 20 7220 1666
James Joyce
Darshan Patel
Fortified Securities – Joint Broker +44 (0) 20 3411 7773
Guy Wheatley
Brand Communications +44 (0) 7976 431608
Public & Investor Relations      
Alan Green

Cadence Minerals #KDNC – European Metals Holdings #EMH Announces Successful Battery-Grade pilot programme for Cinovec Lithium Project

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) detailing the results of the Lithium Chemical Plant (LCP) pilot programme at Cinovec. The results confirm the robustness of the LCP process flowsheet and provide a strong foundation for the execution of the Cinovec Project.

Highlights

  • Pilot programme has confirmed industrial viability of the LCP process flowsheet.
  • Exceptionally clean battery grade lithium carbonate (>99.9%) produced with single-stage purification (bicarbonation) of crude lithium carbonate.
  • Pilot programme crude lithium carbonate confirmed at 99.7% purity, greater than battery grade (99.5%) in the carbonate precipitation step without any additional processing.
  • Work to produce battery grade lithium hydroxide monohydrate is underway.
  • The pilot programme processed ore fully-representative in all respects of the run-of-mine for the first seven years of mining planned at Cinovec, including average grade and expected rock-type mix from the bulk mining.

Next Stage of Development of Cinovec

The DFS for battery-grade Lithium Carbonate remains on-track for completion in 4Q 2023. Subject to confirmation of the pilot programme work for battery grade Lithium Hydroxide, a decision on the battery grade end-product (carbonate vs hydroxide) for the Cinovec Project is expected to be made in early 2024. This will in turn lead to design engineering that will enable the Project to move to production in the shortest possible time frame, and includes engagement with long lead equipment OEMs to ensure that the timeline is expedited.

European Metals Executive Chairman Keith Coughlan said: “The confirmation of the exceptionally clean nature of the Cinovec Lithium Carbonate resulting from the pilot programme is further proof of the tremendous importance of the Cinovec Lithium Project for the whole of the EU.  The Lithium Carbonate produced by the simplified flowsheet has the ability to be a major contributor to the EU’s lithium security. The Cinovec Project is well positioned to be a major supplier of battery grade lithium products to the strategically important European car industry to ensure that they are able to compete on the global stage. The pilot programme data is now being used to confirm design and engineering for the ongoing Definitive Feasibility Study (DFS) being completed by DRA Global and which remains on-track for completion in the current quarter, and also for the post-DFS detailed design. European Metals, in developing the Cinovec Lithium Project, is well positioned for the rising demand in battery materials in the EU. The Cinovec project is the largest hard rock lithium project in the EU and Europe as a whole and is centrally located on the Czech Republic’s border with Germany.”

Link here to view the full EMH announcement

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 5.6% percent of the equity in European Metals Holdings.

For further information contact:

 

 
Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling  
Kiran Morzaria  
   
WH Ireland Limited (NOMAD & Broker) +44 (0) 20 7220 1666
James Joyce  
Darshan Patel  
   
Fortified Securities – Joint Broker +44 (0) 20 3411 7773
Guy Wheatley  
   
Brand Communications +44 (0) 7976 431608
Public & Investor Relations        
Alan Green  

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Cautionary and Forward-Looking Statements

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as “believe”, “could”, “should”, “envisage”, “estimate”, “intend”, “may”, “plan”, “will”, or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the company’s future growth results of operations performance, future capital, and other expenditures (including the amount, nature, and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements, including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes actions by governmental authorities, the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The company cannot assure investors that actual results will be consistent with such forward-looking statements.

The information contained within this announcement is deemed by the company to constitute Inside Information as stipulated under the Market Abuse Regulation (E.U.) No. 596/2014, as it forms part of U.K. domestic law under the European Union (Withdrawal) Act 2018, as amended. Upon the publication of this announcement via a regulatory information service, this information is considered to be in the public domain.

Cadence Minerals #KDNC – Corporate Update – European Metals Holdings #EMH: EBRD Strategic Investment

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) that it has entered into a strategic investment agreement with The European Bank for Reconstruction and Development (“EBRD”) under which EBRD has agreed to invest €6 million to support the Company’s development of the Cinovec Project in the Czech Republic.

As part of the due diligence process, EBRD engaged an independent, international mining consultancy to undertake a technical review of the Cinovec Project. EBRD also performed a review of the Cinovec Project in respect to compliance with EBRD’sEnvironmental and Social Policy.

Highlights:

  • EBRD has agreed to invest €6 million to support the Company’s development of the Cinovec Project in the Czech Republic.
  • ERBD’s investment and expertise will be beneficial to the Company as the Cinovec Project moves through permitting, project financing, and completing its Definitive Feasibility Study (DFS).
  • As part of its due diligence, EBRD engaged an independent, international mining consultancy to conduct a technical review of the Cinovec Project.
  • EBRD is an International Financial Institution owned by the European Union, European Investment Bank and 71 countries, including the Czech Republic.
  • The investment is to be implemented by way of a private placement of 12,315,213 shares of the Company to be issued to EBRD at a price of £0.423 per share. This equates to AUD 0.803 per share

European Metals Executive Chairman Keith Coughlan commented; “The Company welcomes EBRD’s strategic investment, which is a strong endorsement of the Cinovec Project’s value and its commitment to the highest environmental and social standards.  The EBRD investment aims to fund the project’s predevelopment work and opens a pathway to potentially securing project financing.  The successful completion of the technical due diligence process is a testament to the quality of the Cinovec team, the work which has been done to date and a strong vote of confidence in the project. The EBRD investment is confirmation that the Cinovec Project is a vital part of establishing a strong, sustainable European electric vehicle battery supply chain to support Europe’s accelerating transition to e-mobility.”

Natalia Lacorzana, Head of Natural Resources at EBRD said: “We are pleased to support the Cinovec project, the first lithium project financed by the Bank, on its path to become a responsibly mined source of battery grade lithium for Europe.  EBRD is committed to supporting the global transition to a green economy, the move towards wider adoption of electric vehicles, in particular, via providing necessary funding and know-how to junior miners of critical and/or strategic raw materials.

Link here to view the full EMH announcement

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 6.5% percent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
 

WH Ireland Limited (NOMAD & Broker)

 

+44 (0) 207 220 1666

James Joyce
Darshan Patel

Enzo Aliaj

Brand Communications +44 (0) 7976 431608
Public & Investor Relations
Alan Green

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Cautionary and Forward-Looking Statements

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as “believe”, “could”, “should”, “envisage”, “estimate”, “intend”, “may”, “plan”, “will”, or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the company’s future growth results of operations performance, future capital, and other expenditures (including the amount, nature, and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements, including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes actions by governmental authorities, the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The company cannot assure investors that actual results will be consistent with such forward-looking statements.

The information contained within this announcement is deemed by the company to constitute Inside Information as stipulated under the Market Abuse Regulation (E.U.) No. 596/2014, as it forms part of U.K. domestic law under the European Union (Withdrawal) Act 2018, as amended. Upon the publication of this announcement via a regulatory information service, this information is considered to be in the public domain.

Cadence Minerals #KDNC – European Metals Holdings #EMH: Land secured for Cinovec lithium plant

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) that Geomet s.r.o (its 49% owned subsidiary) has agreed to purchase land at the industrial site “Dukla” in the Újezdeček Municipality, 6.2 km south of the planned Cinovec Mine portal area, on which it intends to construct a lithium plant, for a total purchase consideration of US$ 43.96m.

Highlights:

  • Cinovec Project Company, Geomet s.r.o. secures ownership of Dukla industrial site for construction of the Cinovec lithium plant
  • Dukla Plant site will include ore beneficiation plant and battery-grade lithium plant
  • Geomet s.r.o., owner of 100% of the Cinovec Project, to become sole owner/user of site

The Dukla site, which is subject to an existing industrial usage permit, is owned by four private companies, with all peripheral and adjacent land relevant to the site held by Czech State and/or local public bodies.

The Cinovec Project holding company, Geomet s.r.o. (Geomet) which is a forty nine percent (49%) owned subsidiary of European Metals, has agreed to acquire one of the privately-held land packages and entered into exclusive and unconditional option agreements for the purchase of the other three. The Dukla site has been confirmed as an appropriate site upon which to build a lithium plant for the beneficiation of Cinovec ore and production of battery-grade lithium in accordance with the Company’s ongoing DFS which is on track to be completed in 4Q23. This confirmation has been obtained as a result of engineering layout and design work undertaken in the DFS to-date, geohydrological and geotechnical surveys over the site, completed in early 2023.

An application to the Usti Regional Department of Land Use Planning for the rezoning of the land around the Dukla site (which is already zoned for industrial use), ore transport corridor options and the Cinovec Mine portal area was made in April 2022. The result of this re-zoning application is expected to be finalised in 4Q23.

The Company intends to exercise its 3 options and settle these land acquisitions after the re-zoning application has been successful, anticipated to occur in 2024.

European Metals Executive Chairman Keith Coughlan commented; “Acquiring this land secures an integral part of the Cinovec Project – the acquisition of the land on which the Lithium Plant is to be built.  The close location of Dukla to the mine site is critical to the minimisation of transport costs and ESG impact. The acquired land is zoned for industrial use. With the land now secured, DRA Global can complete the layout designs for the lithium plant which are required as part of the DFS and enables the timeline to completion to be maintained.”

Cadence CEO Kiran Morzaria added; “The Dukla land acquisition marks another major milestone in Cinovec’s evolution into a future battery grade lithium supply hub for Europe and the rest of the world. We look forward to further developments.”

Link here to view the full EMH announcement

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 6.8% percent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
 

WH Ireland Limited (NOMAD & Broker)

 

+44 (0) 207 220 1666

James Joyce
Darshan Patel

Enzo Aliaj

Brand Communications +44 (0) 7976 431608
Public & Investor Relations
Alan Green

 

Cadence Minerals #KDNC – European Metals Announcement: Testwork Realises Continued Outstanding Lithium Recoveries

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) that it has achieved favourable testwork results which confirm separation efficiency and capability of flotation of lithium-bearing zinnwaldite.

Highlights:

  • Testwork confirms separation efficiency and capability of flotation of lithium- bearing zinnwaldite from the Cinovec Lithium / Tin Project.
  • Flotation testwork repeatedly reached >95% lithium recovery to flotation concentrates at target Li-grades and mass yield
  • DFS remains on track for completion in Q4 2023

The updated flotation testwork recently undertaken at Nagrom Laboratories (Perth) has repeatedly reached >95% lithium recovery from flotation concentrates at target Li-grades and mass yield. Ongoing testwork to confirm the robust nature of the process and optimise the DFS design has surpassed previous performance indicators.

Results from testing and optimisation of flotation for the concentration of zinnwaldite in fine ore has exceeded expectations and further demonstrated the potential for high overall lithium recoveries when combined with magnetic separation for the coarse particle size ranges.

European Metals Executive Chairman Keith Coughlan commented; “The exceptional lithium extraction results are outstanding and further underline the commercial viability of operations at Cinovec. These results show repeatability of >95% lithium recovery at neutral pH and confirm both capex and opex reductions, demonstrating the strong operational viability of the FECAB plant. We look forward to further results of the ongoing optimisation work as part of the DFS. The neutral pH of the flotation further enhances the already strong ESG credentials of the Cinovec Project particularly when compared to the acid flotation used on micas elsewhere around the globe. We expect the current testwork to be completed by the end of June and will publish the full results.”

Cadence CEO Kiran Morzaria added; “These outstanding lithium recoveries further enhances Cinovec’s already exceptional potential as a future battery grade lithium supply hub for Europe and the rest of the world. We are pleased to remain shareholders and supporters of EMH, and we look forward to further developments.”

Link here to view the full EMH announcement

Cinovec Lithium/Tin Project

Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Cinovec hosts a globally significant hard rock lithium deposit with a total Measured Mineral Resource of 53.3Mt at 0.48% Li2O and 0.08% Sn, Indicated Mineral Resource of 360.2Mt at 0.44% Li2O and 0.05% Sn and an Inferred Mineral Resource of 294.7Mt at 0.39% Li2O and 0.05% Sn containing a combined 7.39 million tonnes Lithium Carbonate Equivalent and 335.1kt of tin.

Cadence Minerals holds approximately 8.1% percent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
 

WH Ireland Limited (NOMAD & Broker)

 

+44 (0) 207 220 1666

James Joyce
Darshan Patel

Enzo Aliaj

Brand Communications +44 (0) 7976 431608
Public & Investor Relations
Alan Green

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Cautionary and Forward-Looking Statements

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as “believe”, “could”, “should”, “envisage”, “estimate”, “intend”, “may”, “plan”, “will”, or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the company’s future growth results of operations performance, future capital, and other expenditures (including the amount, nature, and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements, including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes actions by governmental authorities, the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The company cannot assure investors that actual results will be consistent with such forward-looking statements.

The information contained within this announcement is deemed by the company to constitute Inside Information as stipulated under the Market Abuse Regulation (E.U.) No. 596/2014, as it forms part of U.K. domestic law under the European Union (Withdrawal) Act 2018, as amended. Upon the publication of this announcement via a regulatory information service, this information is considered to be in the public domain.

Cadence Minerals #KDNC – European Metals Announcement: Just Transition Fund Approves Cinovec Project

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note the announcement by European Metals Holdings Limited (ASX & AIM: EMH, OTCQX: EMHXY, ERPNF and EMHLF) that the Cinovec Project has been classified as a Strategic Project for the Usti Region of the Czech Republic. The list of Strategic Projects has been approved by the European Commission, the Czech Central Government and the Czech Regional Goverment in Usti. Being classified as such means that the Cinovec Project has priority for grant funding from the Just Transition Fund (“JTF“) co-funding, ahead of many other projects that have been submitted.

The total amount allocated by the Just Transition fund for the Czech Republic is CZK 41B (€1.64B) of which the Usti region has been allocated CZK 15.8B (approx. €632M).

The first call for grant applications under the JTF opened on 14 November 2022 and closes on 31 December 2023.

Given the total amount which may be applied for by the eleven designated Strategic Projects in the Usti region in the first call is CZK 8.3B (approx €350M) and that the funds allocated in this first call from the Just Transition Fund to these Strategic Projects totals CZK7.3B (approx €300M), although there can be no certainty,  the Company is confident that Cinovec will receive a significant portion of the funds applied for from the JTF for the Project.

The maximum funding to be made available upon application to each Strategic Project in the Usti Region is CZK 1.2bn (approx €49M). The Cinovec Project has been allocated the maximum possible JTF grant of CZK 1.2B (approx €49M), subject to passing through the application process, funds remaining available and obtaining the necessary permits for the early-stage Cinovec work programmes to which this grant funding is planned to be applied to, in particular the early full development of the twin decline entry/egress system for the mine.

Accordingly, *Geomet s.r.o (the Cinovec project company) will apply for JTF Grant funding for the maximum amount of CZK 1.2B (approx  €49M).

EMH Executive Chairman Keith Coughlan said:

“I am very pleased that the European Union via the Just Transition Fund has approved the Cinovec Project as a Strategic Project for the Usti Region of the Czech Republic.  This approval provides further evidence of strong support from the Czech Government and the European Union and the Europe-wide recognition of the critical part which the Cinovec Project will play in enabling the EU to reach its stated goals of lithium self-sufficiency by 2030.”

“The proposed grants from the Just Transition Fund could play an important part in accelerating the development of the Cinovec Project. For example, the initial entry into the deposit via twin declines and ancillary road network at the proposed Dukla site are likely to be early-stage beneficiaries of this funding. This could reduce the time until first ore is produced by the Cinovec Project post final investment decision.  As the funding is in the form of a non-repayable grant this could also have the additional benefit of not diluting the existing shareholders of the Company.”

“European Metals is well positioned for the rising demand in battery materials, developing the Cinovec project, the largest hard rock lithium project in the EU, which is centrally located on the Czech Republic’s border with Germany. The project possesses excellent ESG credentials which will enable the production of battery grade lithium hydroxide and carbonate with potentially one of the lowest CO2 emissions, globally.”

Link here to view the full EMH announcement

*Geomet s.r.o. controls the mineral exploration licenses awarded by the Czech State over the Cinovec Lithium/Tin Project. Geomet has been granted a preliminary mining permit by the Ministry of Environment and the Ministry of Industry. The company is owned 49% by EMH and 51% by CEZ a.s. through its wholly owned subsidiary, SDAS. Headquartered in the Czech Republic, CEZ a.s. is an established, integrated energy group with operations in a number of Central and South-eastern European countries and Turkey.

Cadence Minerals holds approximately 7.2% percent of the equity in European Metals Holdings.

For further information contact:

 

Cadence Minerals plc +44 (0) 20 3582 6636
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666
James Joyce
Darshan Patel

– Ends –

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-looking statements.

Cadence Minerals #KDNC – European Metals #EMH Cinovec PFS Update Delivers Outstanding Results.

Cadence Minerals (AIM/AQX: KDNC; OTC: KDNCY) is pleased to note that European Metals Holdings Limited (“European Metals” “EMH”) has announced the results of the mining update to the 2019 Pre-Feasibility Study (2022 PFS Update), led by mining definitive feasibility study (DFS) consultant Bara Consulting, on the backfilling potential of the Cinovec mine, in which it has a 49% economic interest, in the Czech Republic.

Highlights

  • The 2019 PFS Update for the Cinovec Project has been updated to demonstrate the effect of changes in the mining process to incorporate the use of paste backfill, which results in an increase in annual production, together with changes in lithium and by-product prices to reflect current and expected market conditions.
  • Annual production of battery grade lithium hydroxide monohydrate modelled to increase from 25,267 tpa to 29,386 tpa, an increase of 16%.
  • NPV8 (post tax) increases from US$1.108B to US$1.938B, an increase of 74.9%, based upon a lithium hydroxide price of USD17,000 per tonne which is significantly less than the current price.
  • NPV8 (post tax) increases to over USD 3.09B with a 30% increase in the lithium hydroxide price.
  • Post tax IRR of 36.3% and a payback period of 2.5 years from the commencement of production.
  • Up-front capital cost due to backfilling plant and additional capital costs to produce 29,386 tpa lithium hydroxide increased to US$644m.
  • This 2022 PFS Update assumes the life of mine extraction of 13.1% of the Measured and Indicated JORC Resources at Cinovec.
  • Use of tailings for backfill will result in a far smaller environmental impact, further enhancing the Project’s already strong ESG credentials.

The study updates the outcomes of the previously updated pre-feasibility study announced on 17 June 2019 (2019 PFS Update), for changes in the mining process as well as an increase in annual production and changes in lithium and by-product prices.

As a result of the conclusions of the study, Geomet s.r.o. (Geomet) has changed the planned mining method for the Cinovec orebody from open stoping to longhole stoping with backfill using paste backfill. This change, together with other changes to the material assumptions outlined in this update, increases the Cinovec mine’s proposed ore extraction from 34.5mt up to 54.5mt, enabling an increase in the annual processing rate by approximately 33% per annum over the previous 21-year life of mine, from 1.69mtpa to 2.25mtpa over a now 25-year life of mine.

Link here for the full EMH announcement: https://www.londonstockexchange.com/news-article/EMH/pfs-update-delivers-outstanding-results/15293716

European Metals Executive Chairman Keith Coughlan commented; I am very pleased to report to shareholders on the completion of this 2022 PFS Update for the Cinovec Project which adds significantly to the already robust forecast economics for the project. The results of the study are very positive for the overall economics, resulting in a far greater amount of the ore resource being utilised for production of lithium and increasing the after tax NPV8 from USD1.1B to USD1.94B. The increased NPV assumes a long-term price for lithium hydroxide of US$17,000 per tonne. An increase in the lithium hydroxide price to USD 22,100 would increase the NPV8 (post tax) to over USD 3BN. Given the current price of lithium hydroxide is in the vicinity of USD 40,000 per tonne it is clear that that the Cinovec Project will be critical to European battery self-sufficiency.

“The use of approximately 54% of the plant tailings for backfill will result in a far smaller environmental impact, with much smaller dry stack tailings storage required, further enhancing the already strong ESG credentials of the Project.

“The significant increase in lithium produced will further add to the supply security of the European battery industry. Importantly, even at this increased production rate, the resource is nowhere near fully utilised – paving the way for future assessment of further production increases.

“Cinovec is strategically located in central Europe, in close proximity to the continent’s vehicle manufacturers. With increasing demand for electric vehicles and the expected demands of grid storage capacity, the project is very well placed to supply the European lithium market for many decades.”

Cadence CEO Kiran Morzaria added; “Our congratulations to Keith Coughlan and the European Metals team on an outstanding result at Cinovec. An increased mine life and a resource upgrade that takes the NPV8 from USD1.1bn to USD1.94bn adds substantial value to Cinovec’s already exceptional potential as a future battery grade lithium supply hub for Europe and the rest of the world.”

“Cadence are pleased to remain shareholders and supporters of EMH, and we look forward to further developments.”

Cadence Minerals Holding in EMH following placing

In a separate announcement today, EMH stated that it had conducted a Placement at A$1.40 per CDI to raise approximately A$14.4 million. The Placement issue price represents a 0.7% premium to the Company’s last traded price on 18 January 2022 (A$1.39). Following the placing, Cadence holds approximately 8.7% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. (“Geomet”), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

Link here for the full EMH placing announcement:  https://www.londonstockexchange.com/news-article/EMH/successful-placing-to-raise-aud14-4m/15293733

– Ends –

For further information:

Cadence Minerals plc +44 (0) 7879 584153
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666
James Joyce
Darshan Patel
Novum Securities Limited (Joint Broker) +44 (0) 207 399 9400
Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ‘‘believe’’ ‘‘could’’ “should” ‘‘envisage’’ ‘‘estimate’’ ‘‘intend’’ ‘‘may’’ ‘‘plan’’ ‘‘will’’ or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-lookingstatements.

Cadence Minerals #KDNC – European Metals #EMH Resource Upgrade at Cinovec Lithium Project.

 

Cadence Minerals (AIM/AQX: KDNC; OTC: KDNCY) is pleased to note that European Metals Holdings Limited (“European Metals” “EMH”) has announced final drill results and an upgraded mineral resource estimate for the lithium and tin resources in the Cinovec Lithium-Tin deposit in the Czech Republic.

EMH has recently completed a drilling campaign at Cinovec South, comprising 22 diamond drill core holes for 6,622 metres, with the goal of increasing resource certainty in the existing resource model in and around the initial planned mining areas and upgrading part of the resource from the Indicated category to the higher confidence Measured category.

Highlights

  • Re-classification of 53.3 million tonnes ( MT ) into Measured resource category grading 0.47% Li2O and 0.08% Sn.
  • 5 MT of Inferred resource upgraded to Indicated resource category 
  • The Measured and Indicated resource has increased from 372.4 to 413.4 MT @ 0.47% Li2O and 0.05%Sn .
  • The total Measured, Indicated and Inferred resources have increased by 12.3MT to 708.2MT @ 0.43% Li2O and 0.05% Sn (0.1% Li (0.2153% Li2O) Cut-off).
  • Increase in overall resource to 7.39 MT LCE
  • Analysis received for final 10 diamond core holes in the Geomet s.r.o. drilling program including:
    • Hole CIS-16 returned 101.7m averaging 0.59% Li2O, incl. 11.35m @ 0.85% Li2O
    • Hole CIS-32 returned 61m averaging 0.66% Li2O and 0.17% Sn, incl. 30.5m @ 0.30% Sn
    • Hole CIS-33 returned 113.3m averaging 0.54% Li2O, incl. 14.7m @ 0.60% Li2O
    • Hole CIS-34 returned 111.4m averaging 0.54% Li2O and 0.13% Sn, incl. 21.15m @ 0.71% Li2O and 0.57% Sn

Link here for the full EMH announcement:  https://www.londonstockexchange.com/news-article/EMH/resource-upgrade-at-cinovec-lithium-project/15171030

European Metals Executive Chairman Keith Coughlan commented; “The primary stated aim of this drilling program was to convert a larger portion of the resource to the measured category to provide greater certainty of the financial model and security to financiers. The results clearly indicate that the program has been successful and the robustness and consistency of the Cinovec resource further demonstrated. As we move closer to ultimate financing and offtake discussions, this higher degree of certainty provides more funding options for the project. Results from the final drill holes of the program have been in line with or better than expected. 

“As we have reported previously, because zinnwaldite is paramagnetic, wet magnetic separation, the first stage of the ore processing has the effect of greatly increasing the grade of lithium oxide in the concentrate to approximately 2.85%. The zinnwaldite concentrate produced from Cinovec requires only roasting, compared to the calcination and roasting required of processing spodumene. This not only improves the economics, it will also have the effect of considerably reducing greenhouse gas emissions of the Project when compared to spodumene projects.”

Cadence CEO Kiran Morzaria added; “Today’s resource upgrade for total Measured, Indicated and Inferred resources adds greater value to Cinovec’s already exceptional potential as a future battery grade lithium supply hub for Europe and the rest of the world. Cadence are pleased to remain shareholders and supporters of EMH, and we look forward to further developments.”

Cadence Minerals Holding in EMH

Cadence holds approximately 9.7% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. (“Geomet”), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

– Ends –

For further information:

Cadence Minerals plc +44 (0) 7879 584153
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666
James Joyce
Darshan Patel
Novum Securities Limited (Joint Broker) +44 (0) 207 399 9400
Jon Belliss

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ‘‘believe’’ ‘‘could’’ “should” ‘‘envisage’’ ‘‘estimate’’ ‘‘intend’’ ‘‘may’’ ‘‘plan’’ ‘‘will’’ or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-lookingstatements.

Cadence Minerals #KDNC – European Metals #EMH – Confirmation of Refining Process – Strong results from Locked-Cycle Tests.

Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that European Metals Holdings Limited (“European Metals” “EMH”) has today announced results of locked-cycle testwork, a metallurgical processing assessment conducted on ore concentrate extracted from the Company’s flagship Cinovec lithium project.

Highlights:

  • Successful locked-cycle test (“LCT”) results further support the Cinovec project’s credentials to initially produce battery-grade lithium carbonate.
  • European Metals has demonstrated that Cinovec battery grade lithium carbonate can be easily converted into lithium hydroxide monohydrate with a commonly utilised liming plant process.
  • Six LCTs were planned but testwork was stopped after four cycles as the main process stream compositions had successfully stabilised.
  • Battery grade lithium carbonate was produced in every LCT with lithium recoveries of up to 92.0% achieved in the four LCTs performed.
  • The LCTs tested zinnwaldite concentrate from the southern part of Cinovec, representative of the first five years of mining.
  • Improved fluoride removal process step further enhances project’s economic outcomes as a result of the regeneration and reuse of the ion exchange resins.
  • Further optimisation work in hydrometallurgy processing steps expected to improve lithium recoveries from concentrate to >92.0%.

The Cinovec project, located on the German border of the Czech Republic, is the largest hard-rock lithium resource in Europe, containing lithium-bearing mica known as zinnwaldite which the Company intends to refine using a number of processes initially outlined in a Pre-Feasibility Study (“PFS”) (see ASX Announcement dated: 17 June 2019).

Link here for the full EMH announcement and detailed background on the locked-cycle tests:  https://www.londonstockexchange.com/news-article/EMH/strong-results-from-locked-cycle-tests/14983163

European Metals Executive Chairman Keith Coughlan commented; “In a significant vote of confidence for our Pre-Feasibility Study, the proposed process methodology has been confirmed by excellent locked-cycle test results which also include new processes involving recycle streams. The robustness of the process was further confirmed by the stabilisation of the process streams, enabling the work to stop after only four of the six test cycles were completed. The recovery of up to 92% of the lithium in the zinnwaldite concentrate at this early stage of DFS testwork is very promising for increased recoveries during the planned process optimisation work. Further, an improved fluoride removal step which is cheaper and cleaner represents only the beginning of further optimisation work which we expect will result in greater lithium recoveries and even stronger economics for the Cinovec Project.

It is also encouraging to note that the process was as successful as that conducted during the 2019 PFS on the Central/NW part of the orebody, further underlying the consistency of the Cinovec ore body.

We look forward to providing further updates on the Definitive Feasibility Study work as it unfolds.”

Cadence CEO Kiran Morzaria added; “These locked-cycle test results further highlight Cinovec’s potential as a future battery grade lithium supply hub for Europe and the rest of the world. Cadence are pleased to remain shareholders and supporters of EMH, and we look forward to further developments.”

Cadence Minerals Holding in EMH

Cadence holds approximately 11% percent of the equity in European Metals, which, through its wholly owned Subsidiary, Geomet s.r.o. (“Geomet”), controls the mineral exploration licenses awarded by the Czech State over Cinovec.

– Ends –

For further information:

Cadence Minerals plc +44 (0) 7879 584153
Andrew Suckling
Kiran Morzaria
WH Ireland Limited (NOMAD & Broker) +44 (0) 207 220 1666
James Joyce
James Sinclair-Ford
Novum Securities Limited (Joint Broker) +44 (0) 207 399 9400
Jon Belliss

 

Qualified Person

Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.

 

Forward-Looking Statements:

Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ‘‘believe’’ ‘‘could’’ “should” ‘‘envisage’’ ‘‘estimate’’ ‘‘intend’’ ‘‘may’’ ‘‘plan’’ ‘‘will’’ or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors.  Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. The Company cannot assure investors that actual results will be consistent with such forward-lookingstatements.

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.