Home » Posts tagged 'costerfield mine'

Tag Archives: costerfield mine

ECR Minerals #ECR – Rock Chip Results from Tambo Licence EL7484 and Renewal of Bailieston Licence EL5433

ECR Minerals plc (LON: ECR), the exploration and development company focused on gold in Australia, is pleased to announce further developments at their Victoria exploration licences EL5433 (Bailieston) and EL007484 (Tambo).

ECR Minerals plc has 100% ownership of EL5433 and EL007484 within the state of Victoria, Australia. EL5433 (Bailieston) exploration licence is located 50km east of the Mandalay Resources Costerfield Mine (producing Gold and Antimony). EL007484 (Tambo) is located within the eastern part of the state of Victoria. Both tenements are being operated under ECR Minerals plc Australian subsidiary Company Mercator Gold Australia (‘MGA’).

HIGHLIGHTS

  • Results for 27 rock chips taken from gold prospects within the Tambo licence EL007484 received. Best results include 0.2m @ 22.2 g/t Au and 0.5m @ 5.72 g/t Au.
  • Bailieston exploration licence EL5433 has successfully been renewed for a further 5 years.

CEO Andrew Haythorpe commented: “The pace of developments in Queensland this year ensures that our Lolworth and Hurricane projects remain ECR’s primary focus, but it is gratifying to note that initial rock chip sampling at our hitherto unexplored Tambo project in Victoria has already delivered some noteworthy gold grades. Our Board is firmly of the view that the minimum expenditure requirements to retain the key licenses at Bailieston and Tambo are warranted, and our teams will continue piecemeal work at these licenses throughout the year when it is logistically expedient to do so.”    

TAMBO LICENCE ROCKCHIP RESULTS

Initial ground work was recently undertaken at Victoria licence EL007484 (Tambo) as part of ECR’s 2023 exploration schedule. A total of 27 rock chips were taken from exposed quartz veins in and around the historical gold workings known as the Duke of Cornwall and Swift Creek Reef. Best results include 0.2m @ 22.2 g/t Au and 0.5m @ 5.72 g/t Au and a complete set of results is tabulated in Appendix One below. The gold results correlate with elevated metals of Arsenopyrite and Bismuth. These two minerals are likely pathfinder elements which will help vector towards gold mineralisation in future exploration activities.

RENEWAL OF EL5433 (BAILIESTON)

ECR have also successfully renewed exploration tenement EL5433 (also known as Bailieston) for a renewed 5-year term (expiring March 27th 2028. The Bailieston licence contains the recently explored prospects known as HR3, Cherry Tree and Blue Moon. Although the discoveries made to date have been modest, the best prospects within the tenement still lie in the vicinity of HR3 where the last drillholes returned gold intercepts such as 4m @ 9.01 g/t Au (hole BH3DD043), 0.2m @ 9.22 g/t Au (hole BH3DD042) (see announcement dated October 14 2022 here for full details of these drill results). It is worth noting also that the strike extent at this location is still open to the north and at depth. The Bailieston tenement is situated halfway between the Costerfield Mine and tenements belonging to ASX listed Nagambie Resources, and the district is fast gaining a reputation for Antimony mineralisation. The Costerfield Mine, owned by Mandalay Resources is also producing Gold and Antimony. License EL5433 has a yearly minimum expenditure requirement of AUD $38000, and is adjacent to ECR exploration licenses EL006911 and EL 006912 granted in December 2022. ECR’s total exploration land package at Bailieston is 179 square kilometres.

NEXT STEPS

The Board is of the opinion that Tambo tenement EL007484 and Bailieston tenement EL5433 hold considerable nascent value and warrant the minimum required expenditure per year. As mentioned previously, the HR3 Goldfield on EL5433 still has exploration potential and follow-up work along strike from the previously good drill intercepts, and as such the Board plans to extend the possible strike of gold mineralisation to the north of HR3 with soil geochemistry work followed by drilling.

The Board is pleased with the initial rock chip sampling results at the Duke of Cornwall prospect at the Tambo licence EL007484, and is of the opinion that further investigation is warranted. Our initial findings establishing a strong correlation between Gold, Arsenic and Bismuth will also aid in future exploration. EL007484 is licenced to 25 November 2026 and is eligible for a grant of a further 5-year term provided the minimum expenditure and work commitments are reached. The Board is of the opinion that all ECR’s Victorian assets warrant further work in the future, but this will only take place once market conditions prove more supportive for junior explorers

ECR’s exploration focus this year has shifted towards the two North Queensland projects at Lolworth and Hurricane. Due to the potential size and range of mineralisation already identified (Gold, Antimony, Niobium, Tantalum and Rare Earths) in North Queensland, the assets in this region will remain our primary focus at this point in time.

REVIEW OF ANNOUNCEMENT BY QUALIFIED PERSON

This announcement has been reviewed by Adam Jones, Technical Director of Exploration at ECR Minerals plc. Adam Jones is a professional geologist and is a Member of the Australian Institute of Geoscientists (MAIG). He is a qualified person as that term is defined by the AIM Note for Mining, Oil and Gas Companies.

FOR FURTHER INFORMATION, PLEASE CONTACT:

 

ECR Minerals plc Tel: +44 (0) 20 7929 1010
David Tang, Non-Executive Chairman

Andrew Haythorpe, CEO

Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd   Tel: +44 (0) 207 220 1666
Nominated Adviser

Katy Mitchell / Andrew de Andrade

SI Capital Ltd Tel: +44 (0) 1483 413500
Broker
Nick Emerson
Novum Securities Limited  Tel: +44 (0) 20 7399 9425
Broker

Jon Belliss

Brand Communications Tel: +44 (0) 7976 431608
Public & Investor Relations
Alan Green

ABOUT ECR MINERALS PLC

ECR Minerals is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”) has 100% ownership of the Bailieston and Creswick gold projects in central Victoria, Australia, has six licence applications outstanding which includes one licence application lodged in eastern Victoria. (Tambo gold project). MGA is currently drilling at the Bailieston Blue Moon Project (EL5433) and undertaking geochemical exploration on the Creswick (EL6148) project and has an experienced exploration team with significant local knowledge in the Victoria Goldfields and wider region.

ECR also owns 100% of an Australian subsidiary LUX Exploration Pty Ltd (“LUX”) which has three approved exploration permits covering 946 km2 over a relatively unexplored area in Queensland, Australia.

Following the sale of the Avoca, Moormbool and Timor gold projects in Victoria, Australia to Fosterville South Exploration Ltd (TSX-V: FSX) and the subsequent spin-out of the Avoca and Timor projects to Leviathan Gold Ltd (TSX-V: LVX), Mercator Gold Australia Pty Limited has the right to receive up to A$2 million in payments subject to future resource estimation or production from projects sold to Fosterville South Exploration Limited.

ECR holds a 90% interest in the Danglay gold project; an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines, which has a 43-101 compliant resource. ECR also holds a royalty on the SLM gold project in La Rioja Province, Argentina and can potentially receive up to US$2.7 million in aggregate across all licences.

APPENDIX ONE

TABLE ONE: All Rock Chip results from recent exploration on EL007484, Tambo, Victoria, Australia. (Au = Gold, Bi = Bismuth). Highlights in BOLD;

SampleID Prospect Location Width of Vein

(metres)

Au (g/t) Bi (ppm)
BTR_0001 Swifts Creek Reef 0.01 0.01 2
BTR_0002 Swifts Creek Reef 0.01 0.01 2
BTR_0003 Swifts Creek Reef 0.01 0.01 2
BTR_0004 Swifts Creek Reef 0.01 0.01 2
BTR_0005 Swifts Creek Reef 0.01 0.06 2
BTR_0006 Swifts Creek Reef 0.5 1.35 3.62
BTR_0007 Swifts Creek Reef 0.5 1.43 4.01
BTR_0008 Swifts Creek Reef 0.15 0.01 2
BTR_0009 Swifts Creek Reef 0.15 0.01 2
BTR_0010 Swifts Creek Reef 0.15 0.01 2
BTR_0011 Swifts Creek Reef 0.15 0.01 2
BTR_0012 Swifts Creek Reef 0.3 0.01 2
BTR_0013 Swifts Creek Reef 0.5 0.71 2
BTDCR_0001 Duke of Cornwall Reef 0.3 0.05 2.49
BTDCR_0002 Duke of Cornwall Reef 0.2 22.2 429
BTDCR_0003 Duke of Cornwall Reef 0.3 0.03 2
BTDCR_0004 Duke of Cornwall Reef 1 0.01 2
BTDCR_0005 Duke of Cornwall Reef 1 0.01 2
BTDCR_0006 Duke of Cornwall Reef 1 0.05 6.33
BTDCR_0007 Duke of Cornwall Reef 1 0.01 2
BTDCR_0008 Duke of Cornwall Reef 0.5 0.01 2
BTDCR_0009 Duke of Cornwall Reef 1 0.01 2
BTDCR_0010 Duke of Cornwall Reef 1 0.03 6.86
BTDCR_0011 Duke of Cornwall Reef 1 0.01 9.94
BTDCR_0012 Duke of Cornwall Reef 1 0.01 2
BTDCR_0013 Duke of Cornwall Reef 1 0.01 2
BTDCR_0014 Duke of Cornwall Reef 0.5 5.72 228

ECR Minerals #ECR – Technical Director Adam Jones Updates on Bumper Grades in Hole 34

Technical Director Adam Jones discusses the bumper gold grades in hole BH3DD034 at HR3, Bailieston. Adam talks through the gold grades discovered at different levels in zones 1-4, and outlines his conclusions for the collective data picture across the Maori Reef and Hard Up Reef. Alan asks whether there is a case for developing a mine on ECR’s land at Nagambie-Rushworth, and Adam discusses the the likely activities across the region. We then look at further developments at Creswick, technical target follow-ups and soil samples, before Adam outlines upcoming activities over the next few months, including drill rig movements, Blue Moon etc.

ECR Minerals #ECR – Adam Jones talks to Alan Green

ECR Minerals #ECR interview – Adam Jones talks to Alan Green. We discuss Adam’s site visit to Bailieston and Creswick with new CEO Andrew Haythorpe, before looking at plans to get boots on the ground at the recently awarded Lolworth Range license areas in N Queensland. Adam then discusses the latest developments at Creswick, including recently released LIDAR imagery, and we then look at the recent gold intercepts and developments through drilling at Bailieston, HR3 and the Maori Anticline. Adam talks through the correlation between stibnite and gold, before summarising upcoming developments and delayed assay results.

ECR Minerals #ECR – Drilling the Victoria Goldfields | March 2022

ECR Minerals #ECR – Head Geologist Adam Jones talks to Alan Green about the latest developments from the company’s Lolworth Range, Creswick and Bailieston gold assets in Australia. Adam discusses plans to get on the ground at Lolworth later in 2022, before we look at the most recent assay results and license awards at Creswick. Adam lays out plans for exploration and drilling at Creswick in the coming year. We then discuss assays for hole BH3DD019 at HR3, the deepest hole drilled under the north end of the Maori Anticline which identified four mineralised zones, some of which correlate with nearby deposits at Costerfield, Nagambie and Whroo mines. Adam then talks through the gold grades in hole BH3DD012 and how he arrived on site as the drillers were washing the core and saw the visible gold sample in core from hole BH3DD034. We then look at drilling plans for the Blue Moon prospect this June, on working farm sites which the company now has access to, before turning to the search for a new CEO, and the shortlist the company now has. Finally Adam summarises upcoming events for the next few months.

ECR Minerals #ECR – Gold Drilling Update – Creswick & Blue Moon Australia

ECR Minerals plc (LON:ECR), the precious metals exploration and development company, is pleased to announce positive progress in the Company’s extensive gold drilling programmes being undertaken at the Creswick and Bailieston Blue Moon projects in the State of Victoria, Australia.

Readers are advised to consult the Company’s previous announcement outlining the proposed drilling programmes as follows:

https://polaris.brighterir.com/public/ecr_minerals/news/rns/story/x2q8qzx

Highlights:

  • The Company has now completed 1,687 metres of reverse circulation drilling in 17 target holes at the Creswick gold project targeting multiple quartz vein orientations within the Dimocks Main Shale (“DMS”);
  • The drilling at Creswick successfully intersected multiple quartz reefs as anticipated, and the Company is now awaiting assay results to determine the extent of gold mineralised shoots in samples;
  • In addition, 774 metres of reverse circulation drilling in 6 target holes has been completed at the Blue Moon gold prospect within the Bailieston project area to follow up the significant near surface gold intercept and evidence of a near surface mineralised gold system announced in July 2018;
  • Drilling is continuing at the Blue Moon gold prospect targeting extensions of areas where sulphides have been intersected and gold mineralisation has been identified including visible gold in panned reverse circulation samples;
  • The Board of the Company is reviewing with its technical team the field findings to date, with a view to further drilling in areas of noted interest;
  • A substantial number of samples have now been submitted to the laboratory for testing and the Company is awaiting results;
  • A recent significant increase in the volume of samples being processed at the local laboratories, due to the increasing interest in State of Victoria gold exploration, has slowed the processing time from the original one week turnaround to a slower process extending between 2 and 4 weeks depending on the sample process. As many of our samples have already been in the laboratory for some time, we expect the flow of assay results in the coming weeks;
  • Further updates to the market will be provided at the earliest opportunity as results are received and findings analysed by our technical team.

Craig Brown, Chief Executive Officer commented: “I am extremely pleased to announce the progress achieved by our technical team at Creswick and Bailieston Blue Moon projects in Australia with a combined 2,461 metres of drilling completed in less than a month.

We have successfully encountered a number of host structures that were anticipated and targeted in our drill programmes, and we have panned gold within some of the drill samples.

The Company’s approach has been to define drill targets based on historical exploration, field mapping and soil gochemistry with an iterative review programme to extend drilling where target geological structures and gold mineralisation therein is encountered.

We await assay data to add to our field observations and will provide further updates to the market when assay information has been received and reviewed by the team.”

COMPETENT PERSON STATEMENT

The information in this announcement that relates to Exploration Results is based on information compiled by Dr Rodney Boucher of Linex Pty Ltd. Linex Pty Ltd provides geological services to Mercator Gold Australia Pty Ltd, including the services of Dr Boucher, who has a PhD in geology, is a Member and RPGeo of the Australian Institute of Geoscientists and is a Member of the Australian Institute of Mining and Metallurgy. Dr Boucher has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Boucher consents to the inclusion in the announcement of the material based on his information in the form and context in which it appears.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
David Tang, Non-Executive Chairman
Craig Brown, Director & CEO
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0)161 832 2174
Nominated Adviser
Katy Mitchell/James Sinclair-Ford
SI Capital Ltd Tel: +44 (0)1483 413500
Broker
Nick Emerson

ABOUT ECR MINERALS PLC

ECR is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Limited has 100% ownership of the Avoca, Bailieston, Creswick, Moormbool and Timor gold exploration licences in central Victoria, Australia and the Windidda Gold Project in the Yilgarn Region, Western Australia.

ECR has earned a 25% interest in the Danglay epithermal gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines. An NI43-101 technical report was completed in respect of the Danglay project in December 2015 and is available for download from ECR’s website.

ECR’s wholly owned Argentine subsidiary Ochre Mining has 100% ownership of the SLM gold project in La Rioja, Argentina. Exploration at SLM has focused on identifying small tonnage mesothermal gold deposits which may be suitable for relatively near-term production.

ECR Minerals #ECR – Drilling Update – Black Cat Gold Prospect, Australia

ECR Minerals plc (LON:ECR), the precious metals exploration and development company, is pleased to announce that drilling at the Black Cat gold prospect in the state of Victoria, Australia, has commenced and the first two holes have been successfully completed.

Composite samples representing 4m downhole lengths will be compiled from the Black Cat drill cuttings and sent to be assayed for gold. After receipt of the assay results, composites which have returned anomalous gold grades will be re-sampled on a metre by metre basis and this second set of samples will be sent for assay. Assay turnaround time is estimated to be 2-6 weeks.

Further information in respect of this drill programme is available in the Company’s announcement of 4 February 2019, which can be viewed at the following link:

https://polaris.brighterir.com/public/ecr_minerals/news/rns/story/w1mok9w

Black Cat Photo Gallery

It is also the Company’s intention to provide site photographic images for the Black Cat gold prospect drill location and drilling process on the Company’s website.

The images may be viewed at the following link:

https://www.ecrminerals.com/black-cat-gallery

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
David Tang, Non-Executive Chairman
Craig Brown, Director & CEO

Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0)161 832 2174
Nominated Adviser
Katy Mitchell/James Sinclair-Ford
SI Capital Ltd Tel: +44 (0)1483 413500
Broker
Nick Emerson

ABOUT ECR MINERALS PLC

ECR is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Limited has 100% ownership of the Avoca, Bailieston, Creswick, Moormbool and Timor gold exploration licences in central Victoria, Australia and the Windidda gold project in the Yilgarn Region, Western Australia.

ECR has earned a 25% interest in the Danglay epithermal gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines. An NI43-101 technical report was completed in respect of the Danglay project in December 2015 and is available for download from ECR’s website.

ECR’s wholly owned Argentine subsidiary Ochre Mining has 100% ownership of the SLM gold project in La Rioja, Argentina. Exploration at SLM has focused on identifying small tonnage mesothermal gold deposits which may be suitable for relatively near-term production.

ECR Minerals #ECR – Drilling Update – Creswick Gold Project Australia

ECR Minerals plc (LON:ECR), the precious metals exploration and development company, is pleased to announce that the Company’s drill programme at the Creswick gold project in the state of Victoria, Australia, has commenced and the first four holes have been successfully completed.

Further information in respect of this drill programme is available in the Company’s announcement of 29 January 2019.

In addition, ECR have produced a project specific presentation for the Creswick gold project, which may be viewed on the Company’s website through the following link:

PDF version:

https://www.ecrminerals.com/investors-media/presentations/download?path=ECR%2BCreswick%2BQ1%2B2019%2BDrilling%2B%2BProgramme%2B08-02-19.pdf

PowerPoint version:

https://www.ecrminerals.com/investors-media/presentations/download?path=ECR%2BCreswick%2BQ1%2B2019%2BDrilling%2B%2BProgramme%2B08-02-19.ppsx

It is also the Company’s intention to provide site photographic images for the Creswick gold project drill location and drilling process on the Company’s website.

The images may be viewed through the following link:

https://www.ecrminerals.com/creswick-gallery

COMPETENT PERSON STATEMENT

The information in this announcement that relates to Exploration Results is based on information compiled by Dr Rodney Boucher of Linex Pty Ltd. Linex Pty Ltd provides geological services to Mercator Gold Australia Pty Ltd, including the services of Dr Boucher, who has a PhD in geology, is a Member and RPGeo of the Australian Institute of Geoscientists and is a Member of the Australian Institute of Mining and Metallurgy. Dr Boucher has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Boucher consents to the inclusion in the announcement of the material based on his information in the form and context in which it appears.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
David Tang, Non-Executive Chairman
Craig Brown, Director & CEO
Email:

info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0)161 832 2174
Nominated Adviser
Katy Mitchell/James Sinclair-Ford
SI Capital Ltd Tel: +44 (0)1483 413500
Broker
Nick Emerson

ABOUT ECR MINERALS PLC

ECR is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Limited has 100% ownership of the Avoca, Bailieston, Creswick, Moormbool and Timor gold exploration licences in central Victoria, Australia and the Windidda Gold Project in the Yilgarn Region, Western Australia.

ECR has earned a 25% interest in the Danglay epithermal gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines. An NI43-101 technical report was completed in respect of the Danglay project in December 2015 and is available for download from ECR’s website.

ECR’s wholly owned Argentine subsidiary Ochre Mining has 100% ownership of the SLM gold project in La Rioja, Argentina. Exploration at SLM has focused on identifying small tonnage mesothermal gold deposits which may be suitable for relatively near-term production.

ECR Minerals #ECR – Gold Focused Drill Programme to Commence – Victoria Region Australia

ECR Minerals plc (LON:ECR), the precious metals exploration and development company, is pleased to announce the commencement of its gold focused drilling programme at the Company’s Victoria Region gold projects in Australia.

HIGHLIGHTS:

  • A contract has been signed for 4,000 to 6,000m of reverse circulation (RC) drilling in Victoria, Australia by ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Ltd (“MGA”).

Creswick Gold Project

  • Drilling at the Creswick gold project is expected to commence this week targeting multiple quartz vein orientations identified within the Dimocks Main Shale (“DMS”), which extends over a 15km trend, approximately 7km of which is covered by MGA’s granted exploration licence and exploration licence applications;
  • As announced on 25 September 2018 at Creswick the Company’s exploration mapping has identified a large gold system within the DMS;
  • The DMS is the hard-rock source of much alluvial and deep lead gold, with historical alluvial and deep lead production estimated at up to 2.5 Moz in the Creswick/Berry lead system, and up to 11 Moz in the entire Ballarat area, of which the DMS is a significant contributor.

Bailieston Gold Project

  • Following completion at Creswick, the drill rig will move to the Blue Moon gold prospect in the Bailieston project area to follow-up the significant near surface gold intercept and evidence of a near surface mineralised gold system as announced by ECR on 6 July 2018;
  • The drill target at Blue Moon is a sandstone which has been heavily weathered near surface, but may host higher grade gold mineralisation, including disseminated sulphides, at deeper levels.

Craig Brown, Chief Executive Officer of ECR Minerals plc, commented: “I am delighted to announce the commencement of this dual drill programme at Creswick and Bailieston which is seeking to test multiple gold targets across both projects.

This is an extensive drilling campaign by the Company, and one of the largest we have undertaken in recent times. ECR’s objective is to discover a multi-million ounce gold deposit in Australia and based on the significant technical work undertaken to date, we believe the Creswick and Bailieston licences hold the potential for such a discovery.

All the planned drilling is being undertaken from existing cash resources. The Company will be entitled to claim back a proportion of drilling costs under government grants subsidising drilling. As a result, and assuming on budget operations and cost recovery through grants, the entire programme is estimated to amount to under 20% of existing cash resources.

I would like to thank our technical team and advisers for their hard work in recent weeks to bring this programme together.

We will ensure material developments are released to the market as appropriate during the coming weeks and months.”

COMPETENT PERSON STATEMENT

The information in this announcement that relates to Exploration Results is based on information compiled by Dr Rodney Boucher of Linex Pty Ltd. Linex Pty Ltd provides geological services to Mercator Gold Australia Pty Ltd, including the services of Dr Boucher, who has a PhD in geology, is a Member and RPGeo of the Australian Institute of Geoscientists and is a Member of the Australian Institute of Mining and Metallurgy. Dr Boucher has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Boucher consents to the inclusion in the announcement of the material based on his information in the form and context in which it appears.

MARKET ABUSE REGULATIONS (EU) No. 596/2014

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 (MAR). Upon the publication of this announcement via Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.

FOR FURTHER INFORMATION, PLEASE CONTACT:

ECR Minerals plc Tel: +44 (0)20 7929 1010
David Tang, Non-Executive Chairman
Craig Brown, Director & CEO

Email: info@ecrminerals.com

Website: www.ecrminerals.com
WH Ireland Ltd Tel: +44 (0)161 832 2174
Nominated Adviser
Katy Mitchell/James Sinclair-Ford
SI Capital Ltd Tel: +44 (0)1483 413500
Broker
Nick Emerson

ABOUT ECR MINERALS PLC

ECR is a mineral exploration and development company. ECR’s wholly owned Australian subsidiary Mercator Gold Australia Pty Limited has 100% ownership of the Avoca, Bailieston, Creswick, Moormbool and Timor gold exploration licences in central Victoria, Australia and the Windidda Gold Project in the Yilgarn Region, Western Australia.

ECR has earned a 25% interest in the Danglay epithermal gold project, an advanced exploration project located in a prolific gold and copper mining district in the north of the Philippines. An NI43-101 technical report was completed in respect of the Danglay project in December 2015 and is available for download from ECR’s website.

ECR’s wholly owned Argentine subsidiary Ochre Mining has 100% ownership of the SLM gold project in La Rioja, Argentina. Exploration at SLM has focused on identifying small tonnage mesothermal gold deposits which may be suitable for relatively near-term production.

EXCLUSIVE: Newmont Mining secures license area next to ECR Minerals’ Baileston gold project – Value The Markets

EXCLUSIVE: Newmont mining secures license area next to ECR Minerals’ Baileston gold project

 

There has been a very interesting development next to ECR Minerals’ (LSE:ECR) Bailieston license (EL5433) in Victoria, Australia. Newmont Mining Corp, one of the world’s largest gold producers has just applied for the license for a large block of land right next door. Although the license has yet to be awarded, if it is then this could prove to be a highly significant event for ECR

Excitement was already building for ECR’s 100% Bailieston gold project, given its relatively close proximity to a number of profitable, high-grade operations. The Fosterville gold mine is around 30km to the west and is currently the largest producing gold mine in Victoria. To the southwest, roughly the same distance, sits the Costerfield gold mine, which is another prolific produce.

As promising as the region Bailieston sits in already is, the recent move by Newmont could mark the start of something big for ECR. A company like Newmont typically dedicates a great deal of resources to due diligence prior to securing new licenses. A search of the Victoria State’s ‘GeoVic’ online database confirms it has indeed just applied for license EL006893, which borders Bailieston.

It seems that EL006893 has only become available within recent weeks, which suggests Newmont may have been keeping a close eye on it for some time. This might not be surprising given the resurgence of gold exploration in the region.

Traditionally Central Victoria has been an intensive gold producing area since the precious metal was first discovered there in 1850. In fact, it is only in recent years that Victoria’s gold output has been surpassed by Western Australia’s. Part of the recent revival has been driven by Kirkland Lake Gold, the owner of Fosterville, discovering more than 1.1m ounces of gold last year.

As well as the main EL5433 block shown on the map, ECR’s license also includes a smaller block (Black Cat) directly adjacent to the south of the area Newmont are showing interest in. The block used to be connected to the main section of EL5433, but due to local licensing rules explorers must drop 40% of the license after three years, and a further 40% after five years.

ECR also owns the Moormbool license (EL00628), which it secured in July 2017. The block is largely unexplored and covers approximately 59 square kilometres. This block sits south of Black Cat and the potential new license acquisition by Newmont, with the Costerfield Mine to the south-west currently producing 50,000 ounces of gold per annum. Costerfield is a below surface mine on block EL3310 consisting of narrow high-grade veins.

Then there is the Fosterville gold mine, which enjoys a very high 94% recovery rate, with a reserve grade of 23.1 g/t Au. It is estimated that approximate production costs at Fosterville are around AUD$880 per oz, compared with a current gold price of around AUD$1665 as of today. The mine is expected to produce 300,000 ounces in 2018 and is also rich in by-products such as silver.

Although GeoVic suggests Newmont’s status description for EL006893 is an “application”,  the implications of a major player swooping in to secure a large chunk of the area are clear. Regardless of whether Newmont is successful in its application, it clearly sees enough that it like to regard this specific area as worthy of future exploration work. For ECR Minerals this looks good news and the company seems to be very well placed to take advantage of a gold rush revival in the Central Victoria region.

Authors: Stuart Langelaan & Ben Turney

I would like to receive Brand Communications updates and news...
Free Stock Updates & News
I agree to have my personal information transfered to MailChimp ( more information )
Join over 3.000 visitors who are receiving our newsletter and learn how to optimize your blog for search engines, find free traffic, and monetize your website.
We hate spam. Your email address will not be sold or shared with anyone else.