Technology Minerals #TM1 – Exploration Update on the Asturmet Cu-Co-Ni Project, Asturias, NW Spain
Technology Minerals Plc (LSE: TM1), the first listed UK company focused on creating a sustainable circular economy for battery metals, is pleased to announce initial results from a lithogeochemical programme and targeting studies at its 100%-owned Aramo Copper-Cobalt-Nickel (“Cu-Co-Ni”) Project in Asturias, NW Spain.
Highlights
· First results from new lithogeochemical sampling at the Aramo Mine on the St. Patrick licence confirm high-grades of cobalt and copper, with associated nickel mineralisation
· Grab sampling across multiple mineralized veins and alteration zones have confirmed the style and tenor of mineralisation and have reported assays ranging up to 1% – 28% copper, 0.1 – 1.88% cobalt and 0.1 – 1.68% nickel.
· Lithogeochemical sampling was completed within four accessible working levels at the historic Aramo Cu-Co-Ni mine in Asturias.
· A total of 205 rock samples have been collected and analysed at ALS Laboratories, Loughrea, Ireland.
· This work has formed the basis of a broad characterisation study of extensive zones of alteration and mineralisation which are present and clearly observed within parts of Levels 3 and 4 of the mine.
· A 3D laser survey has also been completed at the Aramo Mine on the historical Levels 3 and 4. This will provide a 3D model framework of the mine workings and allow for systematic and more intensive underground mapping and sampling on these levels.
· This work will lead to a better understanding of the geological and mineralogical model at Aramo, and in turn form the basis of 3D visual planning for diamond drilling targeting unmined mineralization as well as extensions to the main zones.
· Mine archive searches have produced targeting data associated with areas outside of the Aramo mine on the St. Patrick Licence as well as targets associated with several other of the Company’s pending licence applications.
Asturmet Project
The Company holds 100% of the Aramo Project through its 100% wholly-owned subsidiary, LRH Resources Limited (“LRHR”), and LRHR’s 100% wholly-owned subsidiary Asturmet Recursós S.L. (“Asturmet”). The Asturmet Project consists of eight exploration permits or P.I. (Permiso del Investigación): St. Patrick (P.I. 30858), St. Andrew (P.I. 30869), St. David (P.I. 30870), Astur A (P.I. 30864), Astur B (P.I. 30865), Astur C (P.I. 30866) and Astur D (P.I. 30868) along with new application Astur F (P.I. 30880). The licences cover a total area of approximately 535km2. The St. Patrick licence (which covers the historic Aramo Mine), was issued to Asturmet in June 2018. The remaining licences are in the application process with the Spanish Mining Administration, with St. Andrew and St. David licences in the final stages of issuance.
Aramo Mine Lithogeochemical Sampling
A total of 205 samples have been collected during a series of underground sampling programmes. These samples were collected as part of a preliminary mapping and lithogeochemical characterisation study to help determine the distribution and nature of the alteration and mineralisation within different parts of the accessible mine. At this time the most accessible and safest access is on Levels 3 and 4 (155 samples) with restricted access on Level 1 and 2 (46 samples). The Socavon at level 0 (4 samples) does not show significant alteration or mineralisation being positioned within the footwall of the system. Each of these areas have been visited and the number of samples collected are summarised below in Table 1.
Level ID |
Gallery/Stope |
Samples |
Level 0 |
Socavon Adit |
4 |
Level1 |
Portal Spoil Surface |
14 |
Main Adit |
7 |
|
Level 2 |
Portal Spoil Surface |
8 |
Main Adit |
9 |
|
Side Gallery |
8 |
|
Level 3 |
Portal Spoil Surface |
1 |
Arrebolleu Stopes |
6 |
|
San Felipe Stope B |
40 |
|
San Felipe Stope C |
13 |
|
San Felipe Stope D |
2 |
|
San Vincente Zone |
4 |
|
Breccia Corner |
3 |
|
Level 3.5 |
San Felipe Stope A |
20 |
Level 4 |
Metastur Pit |
2 |
Portal Spoil Surface |
11 |
|
Pyrite Vein West |
13 |
|
Horse Head Gallery |
10 |
|
Sta. Barbara Gallery |
8 |
|
San Pedro Gallery |
22 |
|
Total Samples |
|
205 |
Table 1: Lithogeochemical sampling at Aramo
The samples were collected from as many of the historically reported mineralised veins (filons) as are currently accessible. At the highest point on Level 4 there are 5 main veins called Metastur, Vein 5 (Horsehead and Pyrite veins) Santa Barbara and San Pedro. On level 3 the main veins that are accessible are San Felipe and to a lesser extent San Vincente.. It should be noted that the samples collected are a combination of both bedrock/sidewall outcrop, collapsed sidewall material that lie below its source location, and float material from spoil both underground and at surface near the portal. These samples were collected specifically as a method of determining the broadest range and distribution of both alteration, mineralisation and associated grade. The next phase of work will include detailed underground mapping and channel sampling to add to a higher degree of grade distribution clarity to the extensive zones of alteration and mineralization seen underground.
Results from Level 4
Sampling on Level 4 has confirmed broad zones of pale orange partially dolomitized limestone of the mountain limestone unit, these broader zones tend to be relatively lower in grade than the more discrete and significantly higher-grade mineralised zones which align with the known veins which are partially worked at this level (Figure 1). The primary veins underground are Vein 5, Sta. Barbara and Sn. Pedro. Results from material across all the sampled zones at this level includes material assaying up to 1% – 16% copper, 0.1 – 0.42% cobalt and 0.1 – 1.16% nickel.
Figure 1: Aramo mine primary sampled areas on Level 4.
Results from Level 3 and 3.5
Sampling on Level 3 has also confirmed broad zones of pale orange partially dolomitised limestone of the mountain limestone unit, these zones are both more extensive and more connected than Level 4 and clearly exhibit strong structural control relating to several different fault orientations as well as an apparent relation to stratigraphic control. Level 3 alteration and mineralisation also appears to be of a generally higher tenor but still shows variable grade distribution within the alteration zones and veins. There is more underground development on level 3 and the main accessible zone is called San Felipe which is intersected at both Level 3 and level 3.5 across four distinct working areas termed Stope A to D, these are the main areas sampled. Results from material across all the sampled zones at this level includes material assaying up to 1% – 28% copper, 0.1 – 1.88% cobalt and 0.1 – 1.68% nickel.
Results from Level 2
Sampling on Level 2 is restricted to one of the main adits and one side gallery, when the mine closed the company closed off some of the access by piling up waste material to prevent access to the main zone of mineralisation which lies vertically below that seen on levels 3 and 4. Limited access at this time has so far restricted underground sampling to some peripheral alteration and mineralisation outside of the main historically mined areas. Results from material across all the sampled zones at this level includes material assaying up to 1% – 19% copper, 0.1 – 1.38% cobalt and 0.1 – 0.55% nickel.
Results from Level 1
Sampling on Level 1 is also restricted to one of the main access adit and therefore sampling has also been restricted to some minor peripheral alteration and mineralisation. Results from material across all the sampled zones at this level includes material assaying up to 0.5% copper, 0.1 % cobalt and 0.1% nickel. Access further into the main body of the mine will be required in order to reach the main mineralised zones.
Other areas
The Socavon is a lower-level footwall access haulage drift that was not connected to the higher levels of the mine during the active mining period at Aramo. The 1km long adit appears to have been designed to undercut the main mineralised zones within the unmineralised footwall of the mine.
All samples collected have followed a strict sampling and chain of custody process and were analysed by ALS Laboratories in Loughrea, County Galway, Ireland. Samples were analysed by four-acid ICP-AES analysis.
Underground Laser Survey at Aramo Mine
The main period of operation of the Aramo mine was between 1948 and 1955 with peak copper production between 1953 and 1955 before final closure in 1957. An extensive search for historical mine records, underground plans and technical data has to date yielded a limited number of underground maps of variable quality and of relatively little use in the modern context for recording ongoing underground mapping and sampling.
Therefore, the company commissioned a 3D underground laser survey at Aramo which was carried out Sociedad Asturiana de Diversificación Minera (SADIM) a part of Grupo Hunosa, in association with Ingeniero Oscar Diez Regil.
The initial survey was completed in all of the main accessible parts of the mine on levels 3 and 4 (Figures 2 and 3). The preliminary results exceeded expectations both in quality and detail (Figures 4 and 5). The maps that can now be produced from this work have facilitated the accurate georeferencing of all geological and geochemical data collected to date and will form the basis of the next phase of detailed mapping and systematic sampling.
The primary purpose of the survey and associated geological mapping work is to enhance the understanding of the geometry of the mineralising system at Aramo and aid in the planning of surface diamond drillholes targeting both known mineralised zones and potential unmined extensions. This will include verifying the non JORC compliant historically reported “recognised reserves” (detailed below), on mapped structures, both proximal to the mine and also westwards under the plateau.
Figures 2 and 3: Showing the full surveyed areas on parts of levels 3 and 4
Figures 4 and 5: Showing detail of areas at the level 4 portal (left) and the adit at the junction with San Pedro Vein on level 4.
Mine Archive Review
A search for data related to the Aramo Mine and the surrounding licenced areas has been ongoing. Very little data appears to have survived the intervening 70 years since the area was actively producing copper from these areas. However, mine records examined have revealed multiple areas that were licenced at different times across what is now the St. Patrick Licence and which were being targeted with exploration proximal to the Aramo mine for reported copper (and associated cobalt/nickel) occurrences. The same sources show similar historically licenced areas on targets across several of the other licence applications that the Company has with the Mining administration. A full assessment of these newly discovered data are ongoing and will be reported on in due course.
Local Geology
The Aramo Cu-Co-Ni Project is classed as an epithermal carbonate-hosted deposit and lies within the western closure of the Cantabrian Orocline Fold and Thrust Belt. The Aramo Mine is located within the Aramo “Caliza de Montana” stratigraphic unit comprising of organic rich limestones. Mineralisation is broadly confined to wide alteration zones with more localised east – west orientated high-grade veins and stockwork mineralisation. The alteration zones, which are themselves pervasively mineralised, are interpreted to form extensive “pipe-like” bodies with significant vertical development at major fault intersection planes. These zones develop laterally outwards along individual faults creating the so called “Filon” zones. Lower angled stratigraphic bedding within the host limestones within the pipelike zones appear to create flatter zones or lenses of alteration and mineralisation with a 30 – 40-degree orientation dipping westwards.
The primary sulphide mineralisation comprises of copper-nickel-cobalt sulphides with three recognised stages of mineralisation accompanied by dolomite and quartz precipitation. An important supergene stage postdates the sulphides and is associated with calcite gangue. Mineralisation is considered to be Permian in age.
The Aramo copper-cobalt mine on the St. Patrick licence was the main mine in the area and ceased production the late 1950s. The mining operations were on a relatively small scale, and the records for production, grades, development, and geology were poorly kept. One surviving record widely quoted estimated that approximately 200,000 tons of 1-20% Cu, 1-3% Ni and 1-3% Co ore were extracted from the Aramo mine, with at least 400,000 tonnes reported as (for the time non-JORC compliant) “recognised reserves” in a subvertical orebody formed by veins and breccia pipes of 150m by 40-50m and 600m deep. This has not yet been verified, but it is expected that the ongoing work leading to a comprehensive drilling programme in due course will work towards establishing coherent mineralised zones both within the mine area and exploration targets within potential satellite zones/filons that are structurally and stratigraphically associated with the Aramo Fault both to the west and south.
The Aramo Mine
The Aramo mine was most recently in production from 1947 and ceased production in 1957. It has remained dormant for the last 65 years. The mine has several distinct mineralised zones with extensive alteration and associated Cu-Co-Ni mineralisation at a number of levels over a known vertical extent of 530m whilst westwards, there lies a further 200m of vertical prospective stratigraphy above the mine and to the west below the plateau.
Currently there are four primary levels termed Level 1 (995m O.D.), Level 2 (1085m O.D), Level 3 (1150m O.D) with a small sub level and stope termed Level 3.5 (1155m O.D.) and Level 4 (1180m O.D.). Access to-date has been primarily on Level 4 and parts of Level 3 with only limited access completed so far on Levels 1 and 2. The Socavon termed Level 0 is a footwall adit approximately 1km in length and is located at an elevation of 703m O.D. close to the historical mine processing plant. The only mine plans in existence from between 1947 and 1957 illustrate the mine planned development only have been digitally captured and geo-referenced and are represented in Figures 6 and 7 below.
Figure 6: Aramo mine Plan 1947 and 1957 showing the four primary working levels (Plan).
Figure 7: Aramo mine Plan 1947 and 1957 showing the four
primary working levels (oblique view west).
Alex Stanbury, Chief Executive Officer of Technology Minerals, said: “We are pleased the initial results from our sampling survey at the historic Aramo mine within the St. Patrick licence has confirmed high grade Copper-Cobalt-Nickel mineralisation. In the coming months we plan to expand our exploration campaign which will help us continue to gain a better understanding the full potential of the project. The Asturmet Project forms part of our wider strategy to move forward and advance multiple exploration campaigns across our portfolio of mineral resource projects focused on cobalt, copper, nickel, manganese, and lithium.”
Competent Person
All scientific and technical information in this announcement has been prepared under the supervision of EuroGeol Vaughan Williams M.Sc. P.Geo (a Principal of Aurum Exploration Services who currently provides exploration services to LRHR), and a “qualified person” within the meaning of National Instrument 43-101. Vaughan Williams is also company secretary of LRHR and a Director of LRHR’s Spanish subsidiary Asturmet.
The Directors of the Company accept responsibility for this announcement.
For further information please visit www.technologyminerals.co.uk, @TechnologyMinerals on Twitter, or contact:
Technology Minerals Plc |
|
Alex Stanbury, Chief Executive Officer Lester Kemp, Chief Operating Officer Wilson Robb, Chief Technical Officer |
+44 (0)20 4582 3500 |
Oberon Investments Limited |
|
Nick Lovering, Adam Pollock |
+44 (0)20 3179 0535 |
Arden Partners Plc |
|
Ruari McGirr |
+44 (0)207 614 5900 |
Gracechurch Group |
|
Harry Chathli, Alexis Gore, Amy Stupavsky |
+44 (0)20 4582 3500 |
About Technology Minerals Plc
Technology Minerals is developing the UK’s first listed, sustainable circular economy for battery metals, using cutting-edge technology to recycle, recover, and re-use battery technologies for a renewable energy future. Technology Minerals is focused on extracting raw materials required for Li-ion batteries, whilst solving the ecological issue of spent Li-ion batteries, by recycling them for re-use by battery manufacturers. With the increasing global demand for battery metals to supply electrification, the group will explore, mine, and recycle metals from spent batteries. Further information on Technology Minerals is available at www.technologyminerals.co.uk
Technology Minerals #TM1 – Exploration Update on the Asturmet Cu-Co-Ni Project, Asturias, NW Spain
Technology Minerals Plc (LSE: TM1), the first listed UK company focused on creating a sustainable circular economy for battery metals, is pleased to announce the St Patrick licence has been extended for three years and that field operations are progressing with 164 new samples submitted for analysis at the 100% owned Aramo Copper-Cobalt-Nickel (“Cu-Co-Ni”) Project in Asturias, NW Spain.
Highlights
· The St Patrick Licence, on which the Aramo Mine Project is located, has been renewed for three years extending the licence to June 2025.
· A total of 104 rock samples and 43 soil samples collected on the licence during the most recent field campaign, have been submitted for analysis.
· A 3D laser survey has been completed at the Aramo Mine on the historical levels three and four with results exceeding expectations in quality and detail. This work will facilitate more intensive underground mapping and sampling on these levels.
· A new licence application covering two historical copper mines workings termed Astur F covering 73km2 has been submitted for application.
· Field programmes are ongoing at the project with a more expansive exploration campaign planned for the St Patrick Licence in the coming months.
Alex Stanbury, Chief Executive Officer of Technology Minerals, said: “I would like to thank the Ministry of Industry, Employment and Economic Promotion of the Government of Asturias for granting us with the three-year extension for the St Patrick Licence. The licence renewal was awarded following excellent and thorough work from our team who compiled comprehensive technical reports which covered work to date and our plans at St Patrick for the next three years.
“Exploration at St Patrick is progressing well, and we look forward to receiving the analysis of the samples collected during the recent field campaign after initial results at the historic Aramo mine within the St Patrick licence confirmed high grade Copper-Cobalt-Nickel mineralisation. The analysis will further enhance our understanding of the full potential of the project.
“The Asturmet Project forms part of our wider portfolio of mineral resource projects focused on cobalt, copper, nickel, manganese, and lithium. Our exploration strategy is to advance projects up the value curve through prudent use of capital to attract partners and unlock significant potential value to be added to the Company’s portfolio.”
Licence Renewal
The St Patrick Licence on which the Aramo Mine Project is located has successfully completed its first three-year renewal process. The Ministry of Industry, Employment and Economic Promotion of the Government of Asturias extended the St Patrick Licence (P.I. No. 30858) for a further three-year period to June 2025.
As part of the application process, the Company submitted three-year technical reports on work completed to date along with proposed work programmes and associated budgets for the next three-year period. These were approved under the protection of the Law 39/2015, at 1 October, under the Common Administrative Procedure of the Public Administrations. The official resolution of the three-year extension is dated 20 July 2022.
Field Sampling Sample Submission
A total of 104 rock samples (plus 12 QAQC) and 43 soil samples (plus 5 QAQC) for a total of 164 samples were collected during the most recent field campaign and comprised of samples targeting a number of different localities detailed in the table below.
The samples were collected at two primary areas of interest. The first area lies across a 2.5km trend across the St Patrick Licence on the Aramo Plateau and were collected as part of a systematic mapping and sampling programme on a number of significantly altered and mineralised zones (total 83 samples). Secondly a further 20 due diligence samples were collected on the new licence application Astur F at a second historical copper mine site. A single verification sample was also collected within the Aramo Mine on the St Pedro vein system in association with planned petrographic analysis. In parallel with the mapping, 43 soil samples were collected across several anomalous areas identified through a remote sensing survey on the Aramo Plateau. These samples will be used to validate and aid in the signature characterisation of the anomalies identified.
Table 1: List of geochemical samples collected and submitted for analysis.
Licence |
Area |
Prospect \ Working |
Rock \ Soil |
Number of Samples |
St Patrick |
Aramo Mine |
Aramo Level 4 U/G |
Rock |
1 |
St Patrick |
Mina de Cubiellos |
Surface |
Rock |
1 |
St Patrick |
Central East Plateau |
Antenna North |
Rock |
3 |
St Patrick |
Central West Plateau |
Glayiru |
Rock |
8 |
St Patrick |
Central West Plateau |
La Peral |
Rock |
5 |
St Patrick |
Central West Plateau |
Tichin |
Rock |
20 |
St Patrick |
Northern Plateau |
Angliru |
Rock |
13 |
St Patrick |
Northern Plateau |
Moncuevu |
Rock |
3 |
St Patrick |
Southern Plateau |
Antenna South |
Rock |
9 |
St Patrick |
Southern Plateau |
Casa Ingles |
Rock |
8 |
St Patrick |
Southern Plateau |
Casa Ingles North |
Rock |
6 |
St Patrick |
Southern Plateau |
Midway |
Rock |
4 |
St Patrick |
Southern Plateau |
Vega Veneros |
Rock |
3 |
ASTUR F |
Historical Mine Site |
Lower Level Surface |
Rock |
7 |
ASTUR F |
Historical Mine Site |
Upper Level Surface |
Rock |
13 |
QAQC |
QAQC |
12 |
||
Total |
|
|
|
116 |
|
||||
Licence |
Area |
Prospect \ Working |
Rock \ Soil |
Number of Samples |
St Patrick |
Southern Plateau |
Remote Sensing Anomaly |
Soil |
43 |
QAQC |
QAQC |
5 |
||
Total |
|
|
|
48 |
All samples followed a strict sampling and chain of custody process and were analysed by ALS Laboratories in Loughrea, County Galway, Ireland. Samples were analysed by four-acid ICP-AES analysis.
Underground Laser Survey at Aramo Mine
The Company is pleased to report that phase 1 of the first modern and detailed 3D continuous laser survey of part of the Aramo mine has been completed on parts of levels 3 and 4. This work is integral to the upcoming detailed structural mapping and sampling programme to be conducted across several alteration and mineralised zones within the mine. The survey was conducted by respected mining engineers, Sociedad Asturiana de Diversificación Minera (SADIM), a part of Grupo Hunosa in association with Ingeniero Oscar Diez Regil.
The preliminary results have exceeded expectations in quality and detail. The maps produced from this work facilitating the accurate georeferencing of geological and geochemical data will enhance the understanding of the mineralising system and aid in identifying key aspects of the system critical to forward targeting of new zones.
Further work
Field programmes are ongoing at the project with a full and expansive exploration programme planned for the St Patrick Licence in the coming months, which includes geological mapping and sampling, remote sensing analysis detailed geochemical alteration and mineralisation signature analysis through IOGAS and a review of appropriate geophysical techniques to enhance structural targeting for mineralization on the plateau. All of the aforementioned programmes are aimed at delineating drill targets both on the plateau and extending the known mineralization at the Aramo Mine.
Licence Application Astur F
A new licence has been submitted by the wholly owned subsidiary Asturmet Recursos SL in an area in eastern Asturias and termed Astur F (73km2). This area covers several known historical copper mine workings, which initial due diligence sampling confirmed an association with cobalt and nickel which would not have been targeted by the historical operators. With the addition of the Astur F submission, the Company is currently undergoing the application procedure with the mining administration for seven licences (totalling 473km2).
Competent Person
All scientific and technical information in this announcement has been prepared under the supervision of EuroGeol Vaughan Williams M.Sc. P.Geo (a Principal of Aurum Exploration Services who currently provides exploration services to LRH Resources Limited (“LRHR”)), and a “qualified person” within the meaning of National Instrument 43-101. Vaughan Williams is also Company Secretary of LRHR.
The Directors of the Company accept responsibility for this announcement.
For further information please visit www.technologyminerals.co.uk, @TechnologyMinerals on Twitter, or contact:
Technology Minerals Limited |
|
Alex Stanbury, Chief Executive Officer Lester Kemp, Chief Operating Officer Wilson Robb, Chief Technical Officer |
+44 (0)203 488 7510 info@technologyminerals.co.uk |
Arden Partners Plc |
|
Ruari McGirr, George Morgan |
+44 (0)207 614 5900 |
Gracechurch Group |
|
Harry Chathli, Alexis Gore, John Bick |
+44 (0)203 488 7510 |
About Technology Minerals Plc
Technology Minerals is developing the UK’s first listed, sustainable circular economy for battery metals, using cutting-edge technology to recycle, recover, and re-use battery technologies for a renewable energy future. Technology Minerals is focused on extracting raw materials required for Li-ion batteries, whilst solving the ecological issue of spent Li-ion batteries, by recycling them for re-use by battery manufacturers. With the increasing global demand for battery metals to supply electrification, the group will explore, mine, and recycle metals from spent batteries. Further information on Technology Minerals is available at www.technologyminerals.co.uk.
Forward Looking Statements
Certain statements in this announcement may contain forward-looking statements which are based on the Company’s expectations, intentions and projections regarding its future performance, anticipated events or trends and other matters that are not historical facts. Such forward-looking statements can be identified by the fact that they do not relate only to historical or current facts. Forward-looking statements sometimes use words such as ‘aim’, ‘anticipate’, ‘target’, ‘expect’, ‘estimate’, ‘intend’, ‘plan’, ‘goal’, ‘believe’, or other words of similar meaning. These statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties and other factors that could cause actual results to differ materially from those expressed or implied by such forward-looking statements. Given these risks and uncertainties, prospective investors are cautioned not to place undue reliance on forward-looking statements. Forward-looking statements speak only as of the date of such statements and, except as required by applicable law, the Company undertakes no obligation to update or revise publicly any forward-looking statements, whether as a result of new information, future events or otherwise.