Home » Posts tagged 'Andrew Bruton'
Tag Archives: Andrew Bruton
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Lake Giles Feasibility Update – Feasibility Study key consultant site visit to Esperance Port completed.
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that progress towards completion of the Feasibility Study for Macarthur’s high grade magnetite Lake Giles Iron Project is continuing to build pace with a further site visit undertaken this week by its key consultants Stantec, at the Port of Esperance, to inspect the site and facilities.
Highlights:
This week, the Company’s lead consultants (Stantec) visited the Port of Esperance to undertake a formal site visit. Stantec are advising the Company on the design of the non-process infrastructure requirements for the Company’s planned high grade magnetite project in Western Australia, including the design and construction requirements for new rail unloading infrastructure and associated supporting infrastructure such as a planned 300kt storage shed.
The site visit at the Port of Esperance in Western Australia (located approximately 500 km south of the Company’s high grade magnetite project at Lake Giles), was conducted under guidance by representatives of Southern Ports Authority. Macarthur management team representatives accompanied Stantec on the visit, which took in all relevant aspects of Esperance Port that will be necessary to support the engineering design works for on-port infrastructure that will also inform capital and operating cost outputs for the Feasibility Study.
The visit by the Stantec team to the Port of Esperance follows on from a detailed site visit that was completed by the Stantec team at Lake Giles last week (see 19 August 2021 announcement here). The previously announced geotechnical diamond core drill programme at Moonshine and Moonshine North is continuing to progress (see the 12 August 2021 announcement here).
Full Macarthur announcement here: https://finance.yahoo.com/news/lake-giles-feasibility-study-feasibility-120000191.html
Andrew Bruton, CEO of Macarthur Minerals commented: “This week’s visit to the Port of Esperance is an important milestone in the development of the Feasibility Study for Macarthur. We are grateful to the Southern Ports Authority for facilitating the site visit and for extending their cooperation and assistance to the Macarthur and Stantec study teams. The site visit to the Port of Esperance will help inform engineering design works for potential new on-port infrastructure and will also help underpin realistic capital and operating cost assumptions and outputs for the Feasibility Study. We are pleased to be working with Stantec and the Southern Ports Authority. This week’s positive and collaborative activity between our study team and our future partner at the Port brings us another week closer to the completion of the Feasibility Study.”
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Lake Giles Feasibility Update: Feasibility Study closing in on delivery with key consultant site visit completed
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that progress towards completion of the Feasibility Study for Macarthur’s high grade magnetite Lake Giles Iron Project is continuing to build pace.
Highlights
- Site visit conducted by Stantec engineers and consultants at Moonshine and Moonshine North.
- Geotechnical drilling programme of works to support mine planning work continues at site.
- Future site visit for Port of Esperance planned shortly.
- Feasibility Study remains on track for delivery.
Last week, the Company’s lead consultants (Stantec) visited Moonshine and Moonshine North to undertake a formal site visit. Stantec are advising the Company on the design of the process flow sheet for the magnetite process plant, as well as on the non-process infrastructure requirements for the Company’s planned high grade magnetite project in Western Australia.
The detailed visit to the project site, located approximately 115km west of Menzies in Western Australia, was conducted under guidance by Company representatives and took in all relevant aspect of the Lake Giles Iron Project that will be covered by the Feasibility Study at the proposed mine site, as well as other areas required for the development of key non-process infrastructure (including transport logistics infrastructure such as the proposed haul road and rail siding).
The previously announced geotechnical diamond core drill programme at Moonshine and Moonshine North is continuing to progress (see the 12 August 2021 announcement here), and the Company and its study consultants will shortly be undertaking a separate site visit to the Port of Esperance to support the engineering design works for on-port infrastructure that will also inform capital and operating cost outputs for the Feasibility Study.
Andrew Bruton, CEO of Macarthur Minerals commented: “Last week’s site visit is another important milestone in the development of the Feasibility Study for Macarthur. The foundational work required to underpin the delivery of the study will position Macarthur to advance with the execution phase of the project. However, engineering and design works must be married with reality, and in order to deliver truly successful outcomes for future mining operations, the teams responsible for assisting with delivery must experience and understand the landscape and environment within which the project will be developed. Properly examining and experiencing the terrain and conditions will help underpin realistic capital and operating cost assumptions and outputs for the Feasibility Study. We are very encouraged by all the work completed to date. The Study continues to progress within budget and on schedule, and we look forward to updating the market with the final results shortly. Walk with us and discover something big.”
Link here for the full announcement: https://finance.yahoo.com/news/lake-giles-feasibility-study-feasibility-120000427.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Lake Giles Feasibility Update – Geotechnical Drill Programme advancing
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that a geotechnical diamond core drilling programme is presently underway at Lake Giles to support the current Feasibility Study for Macarthur’s high grade magnetite Lake Giles Iron Project, located approximately 115km west of Menzies in Western Australia.
The drilling programme (announced on 6 July 2021 – see announcement here) includes a series of drill holes of between 175 to 220m in depth for a total of 1,560 metres for the purposes of supporting the mine planning work which is necessary for the delivery of the Feasibility Study. The drilling will focus on areas necessary to define the foot wall and the hanging wall parameters of the Moonshine and Moonshine North magnetite pit shells being designed by Orelogy Mine Consulting and Pells Sullivan Meynink.
The Company has engaged iDrilling and Drillwest to undertake the drilling works at locations across Moonshine and Moonshine North. Drill rigs have been mobilised to site and have commenced drilling. The drill programme is expected to take approximately 8 weeks to complete.
Andrew Bruton, CEO of Macarthur Minerals commented: “The geotechnical drilling work is an important component of the current Feasibility Study for Macarthur’s high grade magnetite Lake Giles Iron Project. The Feasibility Study remains on track and this programme of works is another example of the consistent work that is being undertaken by the Company to deliver improved value outcomes for shareholders. We are pleased to be working with iDrilling and Drillwest and look forward to the completion of an efficient and successful programme of works over the coming weeks. Walk with us and discover something big.”
Link here for the full announcement: https://finance.yahoo.com/news/lake-giles-feasibility-study-geotechnical-120000527.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Strengthens DSO Export Position in the Yilgarn Region With Additional Rail Haulage Deal.
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that it has agreed terms with Aurizon (“Aurizon”), for the transport of direct shipment ore (DSO) at a rate of up to 500,000 tonnes per annum between West Kalgoorlie and Kwinana.
Macarthur’s combined rail position now extends the Company’s potential access to rail haulage capacity in Western Australia to almost 1 million tonnes over the next 12 months, and up to 2.1 million tonnes in aggregate over 4 years, subject to securing matching port access.
Increasing Macarthur’s aggregated rail access is critical to accelerating the Company’s early revenue objectives. The maximising of rail capacity is subject to successfully securing matching capacity at Fremantle and Esperance ports.
The Company’s continued incremental approach to building rail access is both deliberate and strategic as it seeks to maximise opportunities for the export of iron ore products at the earliest available opportunity.
Key Agreement Terms
The rail haulage agreement with Aurizon requires the transport of a minimum of 450,000 tonnes over a term of 12 months and is subject to satisfaction of certain conditions precedent (which include Macarthur securing matching port access on commercially acceptable terms, and Aurizon achieving a number of regulatory approvals).
Enhancing the Pathway for Export
The agreement with Aurizon increases Macarthur’s potential contracted rail capacity in Western Australia to just under 1 million tonnes over the next 12 months (and up to 2.1 million tonnes in aggregate over the next 4 years).
Aurizon’s Bulk business is the largest transporter of Iron Ore outside the Pilbara. Rail Capacity is an important link in an emerging transport solution that will enable Macarthur to take advantage of the strong iron ore pricing conditions and target early revenue generation in the current commodity cycle. Macarthur’s early revenue generation targets include the export of GWR’s DSO products whilst the Company completes its planning mining, production and export of a DSO product from Ularring at the earliest available opportunity.
DSO and Magnetite Project Financing to be Accelerated
With Macarthur’s various production strategies now gaining material traction, the Company is determined to accelerate its project financing.
Anticipated cash inflows from Warrants
During the course of September and December this year, a material number of in-the-money warrants are anticipated to be exercised. Those warrant holders electing to exercise will be delivered an opportunity to consolidate their position, and this will in turn, provide the Company with funds to support the pursuit of revenue generating activities.
DSO Funding
In response to material milestones being achieved on project and logistics planning, Macarthur now intends to accelerate arrangements for project financing to support DSO mining operations at Ularring. Management has already advanced its pre-planning over the course of the last several months, and a funding process (at a yet to be determined future price) to support the debt/equity capital requirements for the DSO mining operations is being progressed.
The Company is intending to open formal negotiations for mandates for the purpose of settling the engagements and structuring for the raise of required debt/equity funding to support future DSO mining operations.
Magnetite Funding
Finally, the Company intends to open negotiations for a mandate (or mandates) to secure an early, conditional equity and debt funding deal that will enable Macarthur to progress towards first magnetite production following delivery of the current Feasibility Study. Part of this funding would be allocated to necessary pre-production activities to streamline the delivery of the magnetite project. Opportunities for an early combined funding solution that can support both the planned DSO mining operations and financing of magnetite mining operations through to first production are being actively pursued.
The acceleration of Macarthur’s financing strategy is now firmly in motion as it strengthens its resolve to transition into production as quickly as possible.
Andrew Bruton, CEO of Macarthur Minerals commented: “This agreement has the potential to increase Macarthur’s overall access to rail haulage capacity and enhances the foundations for the Company’s ambitions to commence iron ore exports as soon as possible. It is another pleasing step towards realising our objective to transition to revenue generating activities and Macarthur is delighted to be partnering with Aurizon. With continued diligence, resolve and respectful engagement with key stakeholders, we remain very optimistic that it is now not a matter of if, but when, the Company will finally conclude the balance of the necessary arrangements that will enable it to commence moving and exporting iron ore products. This is only the beginning of the next phase of Macarthur’s journey – walk with us and discover something big.”
Link here for the full announcement: https://finance.yahoo.com/news/macarthur-strengthens-dso-export-position-120000481.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Lake Giles Feasibility Study Advancing under Steady Hand of Global Consultancy Stantec.
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has provided an update on the progress of the current Feasibility Study for the Company’s flagship Lake Giles Iron Project.
The Company’s lead consultant, Engenium now Stantec (Stantec), are advancing metallurgical process test work, process flow sheet development and key non-process infrastructure engineering design work for the Feasibility Study that is presently being undertaken on the Company’s flagship high grade magnetite Lake Giles Iron Project in Western Australia.
Stantec’s highly experienced metallurgical process consultant Mr Neville Dowson leads the metallurgical test work and development of the process flow sheet and engineering works for a metallurgical process plant design that will target delivery of a high grade +65% Fe magnetite concentrate. Under Stantec’s guidance, metallurgical sample testing is underway in Perth utilising the expertise of Bureau Veritas (a world leader in inspection, resting and certification). The results of this test work will provide Stantec with the crucial outputs to complete the metallurgical process flow sheet engineering design work.
Stantec is a highly regarded global consultancy with extensive experience in the mining sector. Stantec’s presence in Australia and Canada provides the perfect platform to deliver Macarthur’s Feasibility Study to required standards for the Australian and Canadian markets. The Stantec team have considerable experience in the design of magnetite processing plants. Dr Richard Peck, Macarthur’s magnetite processing subject matter expert is providing oversight on Stantec’s process design, metallurgical test work programme and preparation of the process design criteria, flow diagram and mass balance.
Jose Granado, Stantec Country Leader for Australia commented: “We are proud to leverage our global expertise and passion for applying sustainable best practice to help advance the Lake Giles Iron Project. By continuing our partnership with Macarthur Minerals, we are ready to deliver a feasibility study that paves the way forward for this important project.”
Macarthur Minerals CEO Andrew Bruton commented: “Following the onset of the Global Covid-19 pandemic early last year and throughout the balance of 2020, the Company has been steadily progressing the foundational work required to underpin the delivery of the study. Much of that work has focused on necessary background work to advance route to market concepts and delivery mechanisms. Although much of that work has not been visible to the market, it is essential.
The Feasibility Study is on track for delivery this year, and with the combined technical capabilities and experience of Stantec’s team lead by Neville Dowson and Macarthur’s highly experienced metallurgical consultant Dr Richard Peck and mining engineer Bernard Holtshousen, the Company has high expectations, and an equally high level of confidence, that the Feasibility Study will meet the expectations of the market.
Stantec’s involvement in key areas will help bring the Feasibility Study in on time and within budget. We look forward to continuing to work with them through these final phases of delivery.”
Link here for the full announcement: https://finance.yahoo.com/news/lake-giles-feasibility-study-lake-120000253.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements
Cadence Minerals #KDNC – Macarthur Minerals Signs Term Sheet With Iron Ore Producer GWR for Mine-Gate Purchase of DSO
Macarthur Minerals (TSX-V: MMS, ASX: MIO) Signs Term Sheet With Iron Ore Producer GWR for Mine-Gate Purchase of DSO.
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced a partnership with an Australian iron ore producer GWR Group Limited (ASX: GWR) (GWR) under a deal which will enable Macarthur to complete a mine-gate purchase from GWR of up to 400,000 tonnes per annum of Direct Shipment Ore (DSO) product from GWR’s Wiluna West Iron Ore Project, located in Western Australia.
Term Sheet for Mine-Gate DSO Purchase from GWR
A binding term sheet signed between the parties paves the way for Macarthur to purchase up to 400,000 tonnes per annum of DSO lump and fines products from GWR at the mine gate for an initial period of 2 years, with the ability to extend for up to a further 2 years.
The sale price for GWR’s DSO will reflect an equitable split of the realised sale price on an FOB basis at the ship rail, having regard to Macarthur’s costs to transport the product, which will be disclosed on an open book basis between the parties. The term sheet is subject to the parties entering into a definitive agreement following completion of the balance of the route to market arrangements by Macarthur on a basis that is commercially acceptable to both parties.
On 8 July 2021 Macarthur also announced that it had entered into a binding term sheet with Pacific National under which Macarthur has secured up to 400,000 tonnes per annum of rail capacity along the rail line between Kalgoorlie and Esperance, supporting a potential DSO export pathway.
The combination of these arrangements could see Macarthur undertaking transport of a GWR DSO product as early as January 2022 (and potentially sooner, subject to availability of suitable rolling stock). This will provide potential for Macarthur to generate early revenue flows between now and planned commencement of commercial mining operations for DSO at Ularring.
The characteristics of the GWR product may also enable Macarthur to create a physical or virtual DSO blend product with Ularring DSO that achieves improved pricing going forward. Macarthur’s iron ore at Ularring is contracted for sale to Glencore under an existing Offtake agreement entered into in 2019.
Ularring DSO Update
Macarthur is continuing to progress planning work for its ’Snark’ deposit at Ularring, with the intention of commencing commercial DSO mining operations at the earliest available opportunity. Given the current strength of the global iron ore market, the Company is targeting development of a simple DSO mining operation utilising mobile crushing and screening equipment.
Macarthur has appointed Perth-based consultants Orelogy Mine Consulting to accelerate mine planning work for this operation. The mine planning will be premised on targeting a low capital, fast development scenario.
Initial mining operations will be focused on the Ularring hematite resource, and specifically the deposits located at Snark and Drabble Downs. These deposits are located within fully granted mining leases, which have existing Environment Protection Authority (“EPA”) approvals. They are also clear of Native Title issues.
The Company also recently made an application for a Miscellaneous Licence covering an area of 74 hectares in the Yilgarn region of Western Australia adjacent to the Snark hematite deposit, to support Macarthur’s non-process infrastructure for the planned DSO campaign.
Gary Lyons, Non-executive Chairman of GWR Group Limited commented: “On behalf of the entire GWR team, we are excited to be developing upon our relationship with Macarthur Minerals Ltd, having taken our flagship high-grade C4 Iron Ore deposit into production earlier this year, with this agreement the future looks very bright for Macarthur Minerals to enter the ranks in the near term of ASX Iron Ore producer.
The opportunity to enter into a mine-gate sale with Macarthur Minerals provides an opportunity for GWR to increase its export tonnage over and above its planned tonnage without impacting upon its current operations, whilst providing Macarthur Minerals with the opportunity to kick-start its Hematite mining operations at Ularring.”
Andrew Bruton, CEO of Macarthur Minerals commented: “Macarthur and GWR have enjoyed a very collaborative relationship over the last couple of years, and both companies understand the importance of co-operating to achieve our respective objectives in the region.
The deal has the potential to enable GWR to realise value for its product by providing additional export capacity. From Macarthur’s perspective, GWR’s offer to enter into a mine-gate sale arrangement can facilitate early revenue flows for Macarthur between now and commencement of commercial mining operations for DSO at Ularring whilst also providing the potential for Macarthur to create a physical or virtual DSO blend product that achieves improved pricing for its Ularring DSO following commencement of planned commercial mining operations there.
The deal with GWR provides opportunities that can benefit both companies, and Macarthur is grateful to GWR for the opportunity to partner with it. We look forward to a mutually beneficial collaboration which we hope will develop into a broader co-operation that can help realise the untapped economic potential of the Yilgarn region and deliver sustainable jobs and economic benefits for the region and for the State of Western Australia into the future.”
Link here for the full announcement: https://finance.yahoo.com/news/macarthur-signs-term-sheet-iron-120000310.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) a Step Closer to DSO Export Pathway With Pacific National Rail Deal
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that it has entered into a term sheet with rail haulage service provider Pacific National, regarding the transport by rail of up to 400,000 tonnes per annum of iron ore between Kalgoorlie and Esperance. The deal will support a potential direct shipment ore (DSO) export pathway.
The Company’s plans to pursue commencement of mining, production and export of a DSO product at Ularring Lake Giles Iron Project at the earliest available opportunity are being advanced. With suitable rolling stock anticipated to be available from Q1 2022, the Company aims to complete the balance of its transport solution as quickly as possible.
Highlights
The Term Sheet with Pacific National provides for an exclusive negotiation period within which the parties will negotiate a rail haulage agreement, subject to the satisfaction of certain conditions precedent (which include Macarthur securing matching port access and materials handling arrangements on commercially acceptable terms) and agreement of the terms and conditions by both parties. Any such rail haulage agreement will be for an initial term of 24 months with options to extend for up to a further 2 years.
The potential deal will deliver an innovative solution for access to above and below rail haulage capacity for Macarthur by enabling the Company to leverage off existing rail paths along the Kalgoorlie to Esperance rail line. This places Macarthur in a unique position to access rail transport in the current market.
Paul Scurrah, Chief Executive Officer and Managing Director of Pacific National commented: “We are delighted to be progressing discussions with Macarthur Minerals to commence direct shipment of ore from their Lake Giles project for export out of Esperance.
The proposed service will utilise available capacity on our existing services operating between Esperance and Kalgoorlie and presents an opportunity to support a greenfield mining operation and create capacity on the network without requiring additional paths. We look forward to supporting Macarthur Minerals in this initial phase of the Lake Giles project and building a sustaining partnership for the future.”
Andrew Bruton, CEO of Macarthur Minerals commented: “At the top of the current strong iron ore market, securing new export pathways for bulk iron ore products in Western Australia remains challenging. Despite these challenges, Macarthur has worked hard to achieve an innovative transport solution in collaboration with the team at Pacific National – placing us in a unique position to access the rail network to Esperance.
The Company intends to continue to target commencement of commercial DSO mining operations at Ularring, and this deal with Pacific National will help lay the foundation for Macarthur’s ambitions to commence iron ore exports at the earliest available opportunity.
Macarthur is very pleased to be partnering with Pacific National. We look forward to updating the market on further developments shortly.”
Link here to view the announcement: https://finance.yahoo.com/news/macarthur-step-closer-dso-export-120000259.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) Lake Giles Feasibility Study Update. Macarthur to commence geotechnical drill programme at Moonshine to support mine planning for flagship magnetite project.
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has announced that it is about to commence a geotechnical drilling campaign to support mine planning work being undertaken as part of the current Feasibility Study for its flagship Lake Giles Iron Project in the Yilgarn region of Western Australia.
The drill programme is planned to commence during July and will involve the drilling of 8 diamond core holes for a total depth of 1560m, with varying depths of between 175 to 230m each.
The drill programme will be undertaken as efficiently as possible and is expected to take between 6 to 8 weeks to complete.
An image accompanying this announcement showing the planned geotechnical holes at the Lake Giles Iron Project preliminary layout is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/c0def0e3-a8f6-47ed-bb00-eb689b97cc27
Macarthur Minerals CEO Andrew Bruton commented: “This important phase of drilling work will provide information targeting the footwall and the hanging wall of the main pits for the first phase of magnetite mining operations at Moonshine and will be used to support mine planning work being undertaken by Orelogy Mine Consulting and Pells Sullivan Meynink (“PSM”) as part of Macarthur’s current Feasibility Study for our flagship, high grade magnetite Lake Giles Iron Project.
The scheduling of the drill programme aligns with the Company’s expectations for delivery of the Feasibility Study. The mobilisation of the drill crew and equipment on site will commence shortly and we look forward to keeping investors updated on the progress of this work over the course of the next few months.”
Link here to view the full announcement and drill hole detail:
https://finance.yahoo.com/news/lake-giles-feasibility-study-macarthur-120000554.html
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements
Cadence Minerals #KDNC – Macarthur Minerals (TSX-V: MMS, ASX: MIO) makes application for additional tenure adjacent to flagship Lake Giles Iron Project to support planned DSO operation
Cadence Minerals (AIM/NEX: KDNC; OTC: KDNCY) is pleased to note that Macarthur Minerals (TSX-V: MMS) (ASX: MIO) (the “Company” or “Macarthur”) has advised that it has made an application for a Miscellaneous Licence covering an area of 74 hectares adjacent to its flagship Lake Giles Iron Project in the Yilgarn region of Western Australia.
The tenure, which is adjacent to the Snark deposit of the Ularring Hematite Project, will support Macarthur’s non-process infrastructure for its planned direct-shipping iron ore (“DSO”) campaign, initially targeting mining of the Snark and Drabble Downs deposits at Lake Giles.
A figure accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/55cc022b-92db-4bf9-898f-1862e15aad8d
Macarthur recently executed an Access Agreement to support the Application over this ground with its long-term associate, local prospector Mel Dalla-Costa. Macarthur intends to advance the Application as quickly as possible to allow the Company to target commencement of DSO production at the earliest available opportunity. The tenure will accommodate the mining operations centre that includes support infrastructure such as vehicle workshops, water storage, site offices, fuel supply and product stockpiling and loadout facilities.
Macarthur Minerals CEO Andrew Bruton commented: “Macarthur continues to advance mine and transport planning for a DSO mining operation at Ularring. This tenure application is another important step towards that objective.
The earliest commencement of revenue generating activities remains one of the Company’s key priorities. With a clear view of the transport logistics challenges that are always evident in a heated commodity market, Management has been taking time over the last several months to ensure that this objective can be optimised in its delivery, to enable the Company to take advantage of current iron ore prices.
The market has been patiently awaiting further details on our progress, and as we continue to advance arrangements for the mining of DSO at Ularring, we expect to provide further updates on this and other planned product export activities shortly.”
Link here for the full Macarthur announcement: https://finance.yahoo.com/news/lake-giles-ularring-dso-macarthur-120000697.html?guccounter=1
Cadence Minerals Holding in Macarthur
Cadence holds approximately 1% of the issued equity interest in Macarthur, which is an Australian mining exploration company focused primarily on iron ore, nickel, lithium and gold in Western Australia. It also has a lithium project in Nevada, USA.
This news release is not for distribution to United States Services or for Dissemination in the United States.
– Ends –
For further information:
|
Qualified Person
Kiran Morzaria B.Eng. (ACSM), MBA, has reviewed and approved the information contained in this announcement. Kiran holds a Bachelor of Engineering (Industrial Geology) from the Camborne School of Mines and an MBA (Finance) from CASS Business School.
Forward-Looking Statements:
Certain statements in this announcement are or may be deemed to be forward-looking statements. Forward-looking statements are identified by their use of terms and phrases such as ”believe” ”could” “should” ”envisage” ”estimate” ”intend” ”may” ”plan” ”will” or the negative of those variations or comparable expressions including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding Cadence Minerals Plc’s future growth results of operations performance future capital and other expenditures (including the amount. nature and sources of funding thereof) competitive advantages business prospects and opportunities. Such forward-looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. Many factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions competition environmental and other regulatory changes actions by governmental authorities the availability of capital markets reliance on key personnel uninsured and underinsured losses and other factors many of which are beyond the control of Cadence Minerals Plc. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions. Cadence Minerals Plc cannot assure investors that actual results will be consistent with such forward-looking statements.